Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2508

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲男人的天堂久久无 | 亚洲 欧美 日韩在线综合福利 | 五月激情婷婷丁香 | 在线国产资源 | 天天干夜夜怕 | 一个人日本的视频免费完整版 | 天天爱天天舔 | 俄罗斯美女18一19处交 | 中文国产成人精品久久一区 | 久青草国产手机视频免费观看 | 日日摸夜夜添夜夜爽免费视频 | h成年同人动漫在线观看网站 | 五月婷六月丁香 | 情五月| 天天插天天干 | 久久这里只有精品国产99 | 久久这里只有精品23 | 成人网页 | 日日摸夜夜添欧美一区 | 天天擦天天干 | 综合热久久 | 全黄色毛片 | 无遮挡激情 | 久久99精品国产免费观看 | 午夜久久网 | 欧美性群另类大交人妖 | 久久国产香蕉一区精品 | 亚洲精品 国产 日韩 | 天堂中文字幕在线 | 在线视频精品播放 | 99精品亚洲| 欧美视频在线播放观看免费福利资源 | 婷婷六 | 美女靠比 | 日本老妇一级特黄aa大片 | 欧美另类videossexo人妖 | 日本欧美中文字幕人在线 | 中国美女牲交一级毛片 | 全国男人的天堂网站 | 狼狼色丁香久久婷婷综合五月 | 处女破处视频免费看 |