国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Preparation for steel structure installation of prefab industrial buildings
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.lhp8.cn

Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2740

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 衡水物流网,衡水物流信息网,衡水物流公司,衡水货运专线,衡水专线运输车辆 | 印刷公司,北京印刷厂,宣传画册手册印刷厂-和智印彩页设计 | 邮政纸箱_淘宝纸箱_抗压纸箱,盐城纸箱,盐城纸箱厂家,盐城承重纸箱-盐城君雅纸箱 | 南京仁康体检--南京仁康门诊部有限公司 | 欧派板材官网 | 全屋定制板材 专业供应商 | 天木生物科技有限公司-高通量自动化-细胞筛选平台 | 什木坊全屋定制官网_木门|护墙|衣柜|橱柜等全品类定制家具 | 山东向阳电子科技有限公司-多用户集中式电能表生产厂家,NB物联网水表,刷卡水电表生产厂家,泰安智能水电表价格 | 天津印刷_天津印刷厂_天津印刷公司_天津包装盒厂家_天津包装盒印刷厂_七层共挤膜厂家_彩色印刷_画册印刷_礼品盒定做 _七层共挤膜_食品真空袋-欢迎访问嘉联包装官网! | 有用的旅游攻略_格林旅行网 | 卧式球磨机_干法球磨机_尼龙球磨机-无锡市少宏粉体科技有限公司 卧螺离心机-固液分离机-台州春鼎机械制造有限公司 | 自动隔油提升设备,消防稳压一体设备,苏州不锈钢消防水箱,污水提升设备厂家,无负压变频供水设备厂家-苏州脉泉供水设备有限公司 | 雷达液位计_耐磨热电偶_蒸汽_柴油,汽油_天然气流量计_巴歇尔槽_一体化温度变送器-江苏翔腾仪表有限公司 | 南京人才网_南京招聘网_南京人才市场最新招聘信息 | 神马影院电影网_实时更新秒播电视剧、电影、动漫的网站 _ 神马影院 | 垃圾分类,北京垃圾分类,有机废弃物处理,智慧环卫,垃圾分类展 | 健力普医疗-半导体激光治疗仪,红外偏振光治疗仪,近红外线治疗仪-独家功能,光疗典范 | 找网页游戏鬼服 高返利鬼服游戏平台 鬼服开服表 - 猫游戏鬼服大全 | 五金冲压件生产厂家_加工五金拉伸件-沧州浚鼎机械制造有限公司-沧州浚鼎机械制造有限公司 | 天津实验室纯水机-GMP认证制药纯化水设备-天津开发区瑞尔环保科技有限公司 | 台式氙灯老化箱-光伏组件-真空老化试验箱|中科万通仪器官网 | 移动破碎站-洗沙机-球磨制砂机-污泥处理-青州冠诚重工机械有限公司 | 上饶市蚂蚁搬家有限公司,上饶搬家公司,上饶同城搬家,上饶同城搬家电话,上饶搬家哪家好,上饶搬家公司电话 | 正拓夏令营官网-中小学生军事夏令营-研学军旅训练拓展夏令营 | 线束加工_线束加工厂_线束厂-苏州缆仕特电子有限公司 | 托普云农-数字农业综合服务商-官方网站 | 山东货架厂家,重型货架,阁楼货架,钢平台,板材货架-山东智造仓储设备有限公司 | 兰州沙盘模型公司_兰州模型公司_兰州沙盘模型厂家_地形沙盘制作_兰州沙盘模型制作公司 | 孝感东方妇科医院_孝感妇科医院哪家好_孝感人流多少钱 | 指挥调度|调度系统|应急指挥调度|应急指挥|可视化调度|多媒体指挥调度|融合通信|综合调度|应急指挥系统|IP调度系统-北京瑞光极远数码科技有限公司 | 黑料网 - 黑料大事记-黑料门 黑料社最新 今日黑料 热门黑料 最新反差免费-黑料网今日黑料首页_黑料网 - 黑料大事记-黑料门 黑料社最新 今日黑料 热门黑料 最新反差免费-黑料网今日黑料首页 | 无线对讲机系统-中继台-山区隧道信号覆盖-贝亚特 | 免费的PPT幻灯片演示制作软件,动画视频及课件制作软件 - Focusky万彩演示大师官网 | 卷帘门,防火卷帘,快速门,硬质快速门,提升门,伸缩门,堆积门,车库门维修-烟台捷曼门业有限公司 | 塑胶篮球场施工|塑胶网球场施工|幼儿园塑胶施工|石家庄亚强体育公司 | 深圳五洲中医院_深圳好的中医院_深圳市医保定点医院[官网] | 商标转让_商标买卖交易平台_商标转让注册网站-世标网 | 正大制管-优质钢管制造商和服务商 | 性激素6项实验检测,放射免疫实验检测,明胶酶谱试剂盒,科研用人血清,质控标品,试剂盒-南京信帆生物技术有限公司 | 健力普医疗-半导体激光治疗仪,红外偏振光治疗仪,近红外线治疗仪-独家功能,光疗典范 | 商业地产策划_商业地产代理_华锦亿爵商业地产顾问机构 |