Key control points for steel structure engineering supervision work

Time:[2023-8-16]  Hits:1682

01

 

Qualification review of construction units

 


Due to the strong professionalism of steel structure engineering, there are high requirements for professional equipment, processing sites, workers' quality, as well as the construction technology standards, quality assurance system, quality control and inspection system of the enterprise itself. Generally, it is mostly subcontracted under the general contract. In this case, the qualification and management level of the construction enterprise are quite important. Therefore, qualification review is an important link, and its review content includes:


(1) Whether the construction qualification and business scale meet the engineering requirements. (2) Whether the construction technical standards, quality assurance system, quality control and inspection system meet the requirements of engineering planning technical indicators. (3) Inspect whether the production capacity of the construction enterprise meets the requirements of the project schedule.

 

02

 

Review of Welder Qualifications

 


Welders must pass the exam and obtain a certificate of qualification, and certified welders must perform welding on their approved projects and scales. (1) Number of views: All views (on-site personnel). (2) Inspection method: Check the welder's qualification certificate, its recognized scale, and validity period.

 

03

 

Drawing review and technical preparation

 


According to the drawing review procedure in the supervision plan, understand the drawings before the start of the project, convene and preside over the drawing review by professional technical personnel from the planning, owner, supervisor, and construction unit. Based on the planning documents and related materials and standards, address any errors, omissions, irrationality, non compliance with standards, and national construction documents in the construction drawings before construction. Coordinate with the owner, planning, and construction units to determine specific treatment measures or plan optimization for drawing issues. Urge the construction unit to organize the minutes of the joint review, and distribute them to all units after all parties sign and stamp them.

 

04

 

Review of construction organization planning (plan)

 


(1) Urge the construction unit to prepare a special construction organization plan (plan) in accordance with the construction contract. After approval by its superior unit, it shall be reported to the supervisor. (2) After review, if the construction organization plan (plan) needs to be changed during construction, the reason and content of the change must be reported to the supervisor and the construction unit for review and approval before the change can be made.

 

05

 

Regular meetings

 


Organize and participate in a weekly construction site meeting jointly attended by the construction, construction, and supervision units to promptly solve construction problems.

 

06

 

Key points for specific control of steel structure engineering preparation work

 


(1) According to the Unified Standard for Construction Quality Inspection of Building Engineering GB50300-2013 and the Standard for Construction Quality Inspection of Steel Structures GB50205-2020, as a sub project, it is divided into sub projects such as steel structure welding, fastener connection, steel parts and steel component processing, steel component assembly, steel structure pre assembly, steel structure device engineering, profiled metal plate, steel structure coating, etc Regarding the raw materials of steel structures (including steel, welding materials, coating materials, etc.), they have a significant impact on the quality of steel structures and are separately included in the steel structure standards.

(2) Check the welder qualification certificate, its recognition scale, and validity period.

(3) The construction party shall conduct welding process evaluation on the steel, welding materials, welding methods, welding heat treatment, etc. used for the first time, and determine the welding process based on the evaluation report. The supervisor has reviewed all the welding process qualification reports and reviewed them according to the planned weld quality level standards. (4) Before installing steel components, check the positioning axis (bay size and span size) and elevation of the building, as well as the standards and fastening of embedded parts, which should meet the planning requirements. (5) When the embedded steel plate on the reinforced concrete bracket top of the engineering column is directly used as the bearing surface of the steel component, the allowable error in the position of the embedded steel plate on the bearing surface should comply with the standard regulations. (6) Steel components should comply with planning requirements and the provisions of this standard. The deformation and coating detachment of steel components caused by transportation, stacking, and lifting should be corrected and modified. (7) The supporting surface of steel components should not be less than 70% of the contact surface between the top and the embedded steel plate surface, and the maximum gap at the edge should not be greater than 0.8mm. (8) Before painting, the surface of the steel should be embroidered in accordance with the planning requirements and current national standards. The treated steel surface should not have welding slag, welding scars, dust, oil stains, water, and burrs. (9) The coating, number of coating passes, and coating thickness should all meet the planning requirements, with an allowable error of -25mm. The allowable error for each layer of dry paint film thickness is -5mm. (10) The appearance of components should not be painted incorrectly or missed, and the coating should not peel or rust back. The coating should be uniform and free from obvious wrinkles, sags, pinholes, and bubbles. (11) According to the actual situation and structural form of the project, the division of inspection batches for each sub project is determined: 1) Steel structure welding sub project: for the project, each frame can be used as an inspection batch; Inspection batches can also be divided into several inspection batches based on different types of steel structure units or components combined with steel structure production and device sub items. 2) Fastener connection sub project: For the project, inspection batches can be divided based on different steel structure units and fasteners of different standards. 3) Steel parts and components processing: Steel parts and components can be divided into several inspection batches according to different types. 4) Steel component assembly: For large steel structures, the steel components produced by the factory need to be assembled into steel components as lifting units before lifting. Due to the high requirements for component assembly, several components can be used as one inspection batch based on the actual situation on site. 5) Steel structure pre assembly: For disorderly shaped steel structures, in order to ensure smooth assembly during high-altitude installation, pre assembly between relevant components needs to be carried out on the ground after production. Inspection batches can be divided according to the assembly between similar components as one inspection batch. 6) Steel structure installation: Steel structure installation can be divided into single-layer steel structure installation sub items or multi-layer and high-rise steel structure installation sub items. Single story steel structure installations can be divided into several inspection batches according to engineering zoning. Multi story and high-rise steel structure installation projects can be divided into one or several inspection batches according to the floor or construction section. 7) Molded metal plate engineering: Molded metal plate engineering includes molded metal plates used for roofs, wall panels, floor slabs, and other areas. From the material perspective, it can be divided into profiled steel plates with anti-corrosion coating on the surface, profiled aluminum plates, etc. It can be divided into one or several inspection batches based on deformation joints, floors, construction sections, or roofs, walls, floors, etc. 8) Steel structure coating engineering: The steel structure coating engineering includes anti-corrosion coating and fireproof coating. The division of inspection batches can be divided into one or several inspection batches according to the principles of steel structure production or steel structure installation engineering inspection batches. (12) The quality inspection content and corresponding qualification standards of sub projects should comply with the following provisions: 1) Steel structure welding, fastener connection, steel parts and components processing, steel component assembly, steel component pre assembly, steel structure device, profiled metal plate, steel structure coating and other sub projects should comply with the qualified quality standards; 2) Quality control materials and documents should be complete; 3) The inspection and witness testing results related to safety and function should meet the requirements of the corresponding qualified quality standards in GB50205-2020 standard;

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 深圳喜运达物流官网_东南亚物流|海运|专线|海外仓_泰国菲律宾马来西亚海运|物流专线|海外仓 | 长春互联网运营值选星广传媒,长春短视频运营,长春新媒体运营,长春互联网运营,长春抖音运营,吉林视频号代运营,吉林快手代运营,短视频推广公司,公众号运营,微博运营,新媒体运营 | 液压支架配件|液压支架立柱|液压支架千斤顶|液压支架换向阀|液压支架乳化油|液压支架密封件-山东卓力生产厂家 | 耐磨螺旋叶片_耐磨螺旋绞龙_KNM螺旋耐磨材料-北京耐默 | 万级无菌室-阳性对照室-干细胞实验室-广州沃霖实验室设备有限公司 | 欧派板材官网 | 全屋定制板材 专业供应商| 绿夏技术导航 - 收录精选资源及优质站点网址! | 天津高压泵-高压清洗机-高压柱塞泵-厂家-价格-天津高压泵格瑞德 天津翻译公司盖章|022-58385822| 翰文博译(天津)商务咨询有限公司 | 郑州润滑油展-第16届中国润滑油、脂及汽车养护展览会-2025年5月27-28日-郑州国际会展中心 | 萘系减水剂|缓凝|早强|聚羧酸|混凝土|石膏板|管桩减水剂厂家-潍坊英宏建材有限公司 | 均高生物科技(上海)有限公司-二十年专注于均质·乳化·粉碎·分散工艺 | 透明捆扎带_束带机打包带_束带机纸带_热封纸带机_上海得亿束带机包装材料有限公司 | 太阳能杀虫灯-农业用杀虫灯-果园灭虫灯厂家「尚科杀虫灯| | 宿州电机维修厂家,大型电机维修及二手电机修理到安徽鑫瑞特电机装备有限公司 | 永磁变频空压机_青岛空压机_螺杆空压机_口罩专用空压机-青岛凯瑞特机电设备有限公司 | 潍坊卓瑞机械有限公司,输送设备,石灰消化设备,餐厨垃圾设备,化机浆设备,污泥脱水 | 酸碱废气中和塔-酸雾废气吸收塔-酸雾废气处理塔|首页-广州市佰镀通风设备有限公司 | 煤泥烘干机,酒糟烘干机,药渣烘干机,酵母烘干机,烘干机厂家-瑞奥新能源 | 西安网站建设,西安网站设计制作,西安短视频拍摄_短视频运营就选动力无限网络推广公司 | 一站式管材,型材,板材,焊接加工等工程材料批发商-佛山市佛孟钢铁有限公司 | 推台锯_多片锯_圆木推台锯_方木多片锯_圆木多片锯-河北茂业机械有限公司 | 南尔智能科技 南尔 小南管家 智慧中控屏 智能语音面板 - 深圳市南尔智能科技有限公司 | 新密耐火材料厂家价格-河南郑州荣盛窑炉耐火材料有限公司 | 惠声电子、广州市惠声电子科技有限公司、VBS、VBS惠声电子、VBS公共广播生产厂家、VBS广播功放生产厂家、VBS会议系统设备批发、VBSIP网络对讲系统厂家、VBS会议系统厂家、VBS智能中控厂家、VBS专业扩声厂家 | 聚丙烯酰胺,聚合氯化铝,重金属捕捉剂,污泥调理剂,活性氧化铝,生石灰,反渗透阻垢剂,工业葡萄糖,硫酸铝,果壳活性炭,柱状活性炭,蜂窝活性炭,石英砂,锰砂-北京雁归来环保科技有限公司-以真诚为立足之本,以质量为生存之本,愿与海内外同仁共创双赢。雁归来人一路走来,气贯长虹,勇锐盖过怯弱,进取压倒苟安!我们紧扣时代脉搏,专注水处理、继往开来! | 湖州网站建设_湖州网络公司_湖州后普网络科技有限公司 | 上海千舟新材料有限公司-美卓隔膜滤板_奥图泰滤板_压滤机配件 | 思为网络_成都百度优化快照排名-成都网站建设优化_成都网页设计_成都SEO公司 | 上海叶拓科技有限公司 | 西安宣传片拍摄,陕西艺景网络科技有限公司资料备份,西安影视公司,视频拍摄制作,抖音视频制作,纪录片拍摄西安短视频摄影团队,西安抖音视频拍摄 | 塑胶跑道厂家_河北小区健身器材_悬浮地板-河北达创体育器材有限公司 | 升降作业平台_自行-车载-液压升降机_登车桥-强峰升降台 | 找刑事辩护律师_找深圳刑事律师多少钱★王平聚【清华博士/刑法教授】 | 木屑烘干机|酒糟烘干机|果渣烘干机_郑州东鼎机械 | 金属网帘|金属帘|装饰网帘|金属环网|金属幕墙网|金属垂帘|金属扣帘-安平县名图金属丝网制品有限公司 | 抛丸机-通过式抛丸机-履带吊钩式抛丸机厂家-青岛泓霖智能设备公司 | 现代卓越官网-专注于pmp培训证书-pmp考试报名时间-pmp认证-项目管理pmp-ACP敏捷管理-NPDP认证 | 浙江创洁卫生消杀有限公司-浙江杀虫公司,温州消杀公司,温州灭鼠公司,灭蟑螂,灭蚊蝇,灭跳蚤,灭书虱,灭臭虫,灭螨虫,白蚁防治,房间消毒除味等专业服务 | 全国重点实验室--人民网| 压瓦机|C型钢机|彩钢设备|C/Z互换檩条机-河北玉发压瓦机 | 威海保温板,威海泡沫,威海EPS,威海EPP-威海东兴泡塑科技有限公司 |