Steel works construction schedule control content

Time:[2014-11-15]  Hits:5488

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 青青草原在线播放 | 中文日韩字幕一区在线观看 | 日韩国产欧美精品综合二区 | 日韩成人影片 | 性导航app精品视频 性荡视频在线播放视频 | 青草久久精品亚洲综合专区 | 亚州1区2区3区4区产品乱码2021 | 免费看曰批女人的视频 | 久久久久久九 | 特一级黄色片 | 91啪国产在线观看 | 久青草香蕉精品视频在线 | 天天射天天干天天 | 91精品国产91久久综合 | 美女被爆羞羞网站 | 日本高清不卡免费 | 一本岛高清v不卡免费一三区 | 欧美影音先锋 | 青草青草伊人精品视频 | ppypp欧美日韩一区二区 | 四虎在线观看一区二区 | 青青草视频官网 | 2022韩国最新三级伦理在线观看 | 天天插日日干 | 欧美日韩一二三区 | 新男人皇宫亚洲男人 | 一级做a爱过程免费视频日本 | 美女扒开内裤光屁股动态图 | 最新chinesegay| 欧美精品一区二区三区在线播放 | 欧美 另类 精品一区视频 | 日本男人的天堂 | 91丨九色丨蝌蚪 首页 | 色偷偷91综合久久噜噜app | 北条麻妃74部作品在线观看 | 91精品国产露脸在线 | 久久久久一级片 | 亚洲欧洲日韩在线 | 日本japanese丰满高清成人视 | www.欧美精品 | 欲之国太子双性h文 |