Home > News > 1. Steel parts and steel components processing requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.lhp8.cn

1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4898

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本xxx在线 | 欧美在线免费 | 任我爽在线视频精品凹凸精品分类 | 高清欧美日本视频免费观看 | 日日摸夜夜添夜夜添毛片 | 张柏芝在线观看 | 日本宅男午夜免费永久网站 | 亚洲欧美日韩中字综合 | 四虎影库网址 | 日韩日韩 | 亚洲一区二区三区免费观看 | 看全大色黄大色黄大片一级爽 | 大美女沟沟黑色森林 | 日本特级淫片免费看 | 男人的j桶进女人的p无遮挡 | 欧美一区日韩一区中文字幕页 | 久久免费资源福利资源站 | 久久精品无码一区二区三区 | 亚洲精品在线看 | 日韩一区二区免费看 | 百合扶她小说 | 最新国产网址 | 高清精品美女在线播放 | bt天堂网www.最新版 | 麻豆国产在线不卡一区二区 | 青青草青青操 | 亚洲欧美人妖另类激情综合区 | 青青草原网站在线观看 | 日本欧美激情 | 日本在线看免费 | 99精品国产兔费观看66 | 久久99国产精品视频 | 日韩一区二区视频 | 玖草视频在线观看 | 久久这里只有精品6 | 五月婷婷激情综合 | 欧洲美妇做爰 | 色版网站| 大西瓜pro亚洲福利在线观看 | 日本激情视频在线观看 | 日韩中文字幕久久精品 |