Guangzhou Steel tells you: Management of Steel Construction Safety Control

Time:[2015-7-23]  Hits:5371

Guangzhou Steel tells you: Management of Steel Construction Safety Control

 


Along with the development of society, steel works from an economic, practical, seismic, may increasingly being recognized in the use and so on, followed with an increase in steel works, steel in construction, production safety problem is getting outstanding. Steel Construction site safety management in spite of the complex, but as long as we can to strengthen the control and inspection for the main part of the construction process, so fine, standardized management, I believe that we will be able to ensure the smooth construction of production, orderly and safe conduct . Guangzhou Steel

First, the limb, the hole, protection problems working height analysis and discussion

1, the pressure plate in order to lay, cut limb, the hole generating pressure plate laying steps rubato, adjustment, riveted, laying sequence should start from the side of successive start laying the perimeter, that is to cut the limb, hole generation also eliminates the safety channel (the main beams and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint work, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying work should be laid at the bottom of the pressure plate beforehand hanging over one level safety net, rubato, adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard not leak riveting or staking, riveting avoid leakage occurs apron appearance.

2, limb, hole protection. Plane or on the ground floor of the elevator shaft on the periphery of tube wells and the floor and sides of the hole grew to 1.5m periphery with a height of 1.2m scaffolding erection of protective railings, entrance hanged retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two hanged retardant safety net level (ground floor flat on the ground covered with flame retardant online Dense mesh safety net). Hole, limb protection to ensure the safety of staff, the hole in the flat screen play to avoid falling material injury to the upper junior staff role.

3, protective measures height works: First Parachute. To avoid falling height, the operator during high places, it is necessary to use seat belts. Since the steel construction when a large scope of activities, the selection of the general seat belt is difficult to meet the construction requirements, should be used with the speed difference from the controller (also known as anti-dropping speed difference or buffers or anti-dropping) seat belt. When lifting steel columns and apparatus, in order to ensure that workers in a safe state by removing the hoisting rope, the hook by hanging ropes at a height determined according to the site, for hanging seat belt safety catch. When people climb the steel ladder, use self-locking device Dropped solve the problem of unprotected steel ladder. Use self-locking device should pay attention not hold against; when people climb, self-locking device with construction workers always counterparts. It is necessary to seat belt hanging on the hook safety catch to avoid falling accidents. Second, beams, safety rope hanging on steel columns. After more than two fixed steel columns stability, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high 70mm × 70mm × 7mm for supporting a safety rope, and the choice of basket bolt tensioning the safety rope, safety rope to avoid too long cause fail-safe. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporarily lifting with the ladder, the choice of 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do with a 14-round do stepladder, ladder width should not be less than 40cm, it is necessary to connect with the steel columns for solid, stable, can not shake. Fourth, operating channels. When the steel beams and the support means, the main steel beams hung site safety rope, they will hang in a protective belt rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, from the first stage in the erection of the steel column capitals 1.2m operating channels. Site construction schedule based on the number of channels determined to ensure that the turnover is normal, does not affect the lifting work. Setting means operating channels to welders to create a good working environment, to ensure safe operation of the welder. The channel dismantling convenient, safe and reliable, to steel columns docking device, proofreading, weld appearance processing, ultrasonic testing and other processes guarantee the supply of safe production.

Second, the material lifting, hoisting problem analysis and discussion

1, means the use of tools such as a torque wrench, crowbar, grinder, etc. safety rope should be used, to avoid falling. Readily with bolts and gaskets should be placed in the tool bag.

2, the construction work in all possible falling objects should be removed or to be fixed.

3, in the high altitude cutting gas cutting or welding, should take measures to avoid cut metal, bead or sparks falling wounding.

4, in the process of lifting and means, first check the rigging, rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe condition should immediately report the officer to stop the construction.

Third, Hot Work Analysis and discussion

1, according with the requirements of the two groups when the flare fire extinguisher, let someone see the fire, then use the bucket underneath spark.

2, the hand must not touch the oxygen cylinder oil, to avoid the crane or other mechanical oil fell on the oxygen cylinder.

3, oxygen and acetylene bottles have the necessary standards placed above the cylinders set the isolation measures to avoid cross-ignited gas cylinders working. If necessary, the use of acetylene bottle with anti-tempering device, strict implementation of electrical welder safety procedures.

4, welders role Basket hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.

5, then the use of spark fighting. To avoid scalding accidents and fire sparks produced by welding and cutting, welding and cutting height it is necessary to set up contact spark bucket, use rockwool fire-retardant material inscribed spark fighting then melt beads, bead avoid splashing out again energize plate .

Fourth, the steel unit construction analysis and discussion of other security measures

Strict implementation of the steel unit construction safety management systems and safety procedures, standards, criteria, and do all the security measures, strict, "Sambo, four" protection. Strict implementation of the rules of safe use of electricity. Working at Height Safety erection of scaffolding, safety barriers and safety nets for protection, the staff necessary to wear a seat belt. Lifting steel unit construction work area should be located cordon, as a clear sign, and let someone responsible. In addition to the safety rope hanging on steel beams, steel columns, the limb should protect not kept pace with the limb in the floor, the hole set cordon of red and white, and set up warning signs in the limb at the floor (height work it is necessary to hang your seat belt or safety slogans, etc.). Hoisting prohibited into or through non-construction personnel lifting area. Trial before the formal lifting cranes, lifting equipment inspection work, ropes, anchor points. After confirmation, before the official lifting. Smooth lifting action, when more than one hoist work together, starting and stopping concerted action to avoid the workpiece vibration and swing. Time to find a place after being leveled, the workpiece can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take safety measures, and enhance on-site surveillance, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel construction lifting equipment necessary staff remained at their posts, obey the command to listen to the unified command, to not immediately clear signal should ask, non guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations, standards. The main component lifting should be done in the morning, the other lifting work should be carried out during the day, avoid work at night. Night work is necessary to have sufficient reliable lighting. Wind prohibited in four and more than four hoisting, nor sleet weather hoisting work. When hoisting steel apparatus construction, construction personnel shall not below the workpiece, the force with neighboring ropes and other dangerous places to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable safety measures and approved by the relevant person in charge. Member hoisting should fitters, electricians responsible for the maintenance lifting machinery equipment, cut off the power to stop working should be ensured. All steel construction means construction workers necessary to wear helmets, high-altitude work necessary to have seat belts. Do not drink and steel unit construction work and production whim, forced prohibited illegal operation.

V. Conclusion

As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state hole, limb, like high places; professional construction and project management staff are at a high concentration of interchange work environment ; the whole engineering components and construction equipment, materials and various security facilities material characteristics required special hoisting, lifting, etc., to their construction safety management difficult. Therefore, the strengthening of steel construction safety management is particularly important. Guangzhou Steel

 

Along with the development of society, steel works from an economic, practical, seismic, may increasingly being recognized in the use and so on, followed with an increase in steel works, steel in construction, production safety problem is getting outstanding. Steel Construction site safety management in spite of the complex, but as long as we can to strengthen the control and inspection for the main part of the construction process, so fine, standardized management, I believe that we will be able to ensure the smooth construction of production, orderly and safe conduct . Guangzhou Steel

First, the limb, the hole, protection problems working height analysis and discussion

1, the pressure plate in order to lay, cut limb, the hole generating pressure plate laying steps rubato, adjustment, riveted, laying sequence should start from the side of successive start laying the perimeter, that is to cut the limb, hole generation also eliminates the safety channel (the main beams and pillars of the seam welding, weld appearance processing, ultrasonic testing, several processes up paint work, only in the middle of each of the axes laid together by two scaffold boards makes up the secure channel) laying process. Before laying work should be laid at the bottom of the pressure plate beforehand hanging over one level safety net, rubato, adjustment should wear seatbelts, Staking should promptly adjust the pressure plate riveted good good, requiring plank and riveting synchronized springboard not leak riveting or staking, riveting avoid leakage occurs apron appearance.

2, limb, hole protection. Plane or on the ground floor of the elevator shaft on the periphery of tube wells and the floor and sides of the hole grew to 1.5m periphery with a height of 1.2m scaffolding erection of protective railings, entrance hanged retardant safety net level. Railing plug located retardant Fine Mesh Legislative Network. Length was longer than 1.5m hole, lift wellhead, should be changed every two hanged retardant safety net level (ground floor flat on the ground covered with flame retardant online Dense mesh safety net). Hole, limb protection to ensure the safety of staff, the hole in the flat screen play to avoid falling material injury to the upper junior staff role.

3, protective measures height works: First Parachute. To avoid falling height, the operator during high places, it is necessary to use seat belts. Since the steel construction when a large scope of activities, the selection of the general seat belt is difficult to meet the construction requirements, should be used with the speed difference from the controller (also known as anti-dropping speed difference or buffers or anti-dropping) seat belt. When lifting steel columns and apparatus, in order to ensure that workers in a safe state by removing the hoisting rope, the hook by hanging ropes at a height determined according to the site, for hanging seat belt safety catch. When people climb the steel ladder, use self-locking device Dropped solve the problem of unprotected steel ladder. Use self-locking device should pay attention not hold against; when people climb, self-locking device with construction workers always counterparts. It is necessary to seat belt hanging on the hook safety catch to avoid falling accidents. Second, beams, safety rope hanging on steel columns. After more than two fixed steel columns stability, it is necessary to set up safety rope pull (or coarse coir rope) in order to fasten the seat belt hanging. Φ6mm rope hanging on steel beams, suspension height 1.2m, erected at intervals of not less than 1.2m 3m high 70mm × 70mm × 7mm for supporting a safety rope, and the choice of basket bolt tensioning the safety rope, safety rope to avoid too long cause fail-safe. When workers walking on the beam, with the necessary security safety ropes hanging. Third, the steel ladder setting. Temporarily lifting with the ladder, the choice of 70mm × 70mm × 7mm do ladder support, the use of M14 bolts angle is fixed on steel columns, use 40mm × 4mm flat steel ladder handrails do with a 14-round do stepladder, ladder width should not be less than 40cm, it is necessary to connect with the steel columns for solid, stable, can not shake. Fourth, operating channels. When the steel beams and the support means, the main steel beams hung site safety rope, they will hang in a protective belt rope walking. Steel columns segmenting means. Docking, when the bolt, in order to ensure safe operation of the workers, from the first stage in the erection of the steel column capitals 1.2m operating channels. Site construction schedule based on the number of channels determined to ensure that the turnover is normal, does not affect the lifting work. Setting means operating channels to welders to create a good working environment, to ensure safe operation of the welder. The channel dismantling convenient, safe and reliable, to steel columns docking device, proofreading, weld appearance processing, ultrasonic testing and other processes guarantee the supply of safe production.

Second, the material lifting, hoisting problem analysis and discussion

1, means the use of tools such as a torque wrench, crowbar, grinder, etc. safety rope should be used, to avoid falling. Readily with bolts and gaskets should be placed in the tool bag.

2, the construction work in all possible falling objects should be removed or to be fixed.

3, in the high altitude cutting gas cutting or welding, should take measures to avoid cut metal, bead or sparks falling wounding.

4, in the process of lifting and means, first check the rigging, rope, hook is solid, you want to choose a suitable hanging points before lifting, if found unsafe condition should immediately report the officer to stop the construction.

Third, Hot Work Analysis and discussion

1, according with the requirements of the two groups when the flare fire extinguisher, let someone see the fire, then use the bucket underneath spark.

2, the hand must not touch the oxygen cylinder oil, to avoid the crane or other mechanical oil fell on the oxygen cylinder.

3, oxygen and acetylene bottles have the necessary standards placed above the cylinders set the isolation measures to avoid cross-ignited gas cylinders working. If necessary, the use of acetylene bottle with anti-tempering device, strict implementation of electrical welder safety procedures.

4, welders role Basket hang provided on the main beam wing pendant. Welding operator seat belt safety rope hung, you can rest assured welding. This hanging basket hanging demolition convenient, safe, reliable, versatile, high-strength bolts it to a final twist, weld appearance processing, ultrasonic testing and other production processes provides a safety guarantee.

5, then the use of spark fighting. To avoid scalding accidents and fire sparks produced by welding and cutting, welding and cutting height it is necessary to set up contact spark bucket, use rockwool fire-retardant material inscribed spark fighting then melt beads, bead avoid splashing out again energize plate .

Fourth, the steel unit construction analysis and discussion of other security measures

Strict implementation of the steel unit construction safety management systems and safety procedures, standards, criteria, and do all the security measures, strict, "Sambo, four" protection. Strict implementation of the rules of safe use of electricity. Working at Height Safety erection of scaffolding, safety barriers and safety nets for protection, the staff necessary to wear a seat belt. Lifting steel unit construction work area should be located cordon, as a clear sign, and let someone responsible. In addition to the safety rope hanging on steel beams, steel columns, the limb should protect not kept pace with the limb in the floor, the hole set cordon of red and white, and set up warning signs in the limb at the floor (height work it is necessary to hang your seat belt or safety slogans, etc.). Hoisting prohibited into or through non-construction personnel lifting area. Trial before the formal lifting cranes, lifting equipment inspection work, ropes, anchor points. After confirmation, before the official lifting. Smooth lifting action, when more than one hoist work together, starting and stopping concerted action to avoid the workpiece vibration and swing. Time to find a place after being leveled, the workpiece can not unlock fixed before hoisting rigging. Finds it necessary to suspend the lifting process, it is necessary to take safety measures, and enhance on-site surveillance, troubleshooting as soon as possible, so that the workpiece can not be a long time in a suspended state. Participate steel construction lifting equipment necessary staff remained at their posts, obey the command to listen to the unified command, to not immediately clear signal should ask, non guesswork operation. Field staff positions necessary to have the necessary knowledge of lifting, and familiar with the relevant regulations, standards. The main component lifting should be done in the morning, the other lifting work should be carried out during the day, avoid work at night. Night work is necessary to have sufficient reliable lighting. Wind prohibited in four and more than four hoisting, nor sleet weather hoisting work. When hoisting steel apparatus construction, construction personnel shall not below the workpiece, the force with neighboring ropes and other dangerous places to stay. No person shall when lifting or hoisting equipment lifting of the workpiece, along with special circumstances when it is necessary to lift, it is necessary to adopt reliable safety measures and approved by the relevant person in charge. Member hoisting should fitters, electricians responsible for the maintenance lifting machinery equipment, cut off the power to stop working should be ensured. All steel construction means construction workers necessary to wear helmets, high-altitude work necessary to have seat belts. Do not drink and steel unit construction work and production whim, forced prohibited illegal operation.

V. Conclusion

As the steel project has the full in the construction process, the whole process around the clock in a highly dangerous state hole, limb, like high places; professional construction and project management staff are at a high concentration of interchange work environment ; the whole engineering components and construction equipment, materials and various security facilities material characteristics required special hoisting, lifting, etc., to their construction safety management difficult. Therefore, the strengthening of steel construction safety management is particularly important. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 免费照片视频制作软件_照片做成视频的软件_制作照片视频的软件 - 万彩影像大师官网 | 益家304不锈钢水管厂家|批发代理|价格|薄壁|广东益家管业有限公司 | 世博磁力泵,耐腐蚀磁力泵,耐酸碱磁力泵,氟塑料磁力泵-苏州冠裕机电科技有限公司 | 涡流探伤仪-超声波探伤仪-上海仓信电子科技有限公司 | 无锡泡沫包装生产厂家-江阴源欧包装材料有限公司 | 眉山净源居环保科技有限公司,眉山除甲醛公司,眉山甲醛治理,眉山保洁服务,眉山家政保洁,眉山家电维修 - 眉山净源居环保科技有限公司,眉山除甲醛公司,眉山甲醛治理,眉山保洁服务,眉山家政保洁,眉山家电维修 | 美标球阀_美标闸阀-浙江川一阀门有限公司| 停车场收费管理系统,通道闸系统,门禁系统,东莞停车场收费管理系统,东莞通道闸系统,-东莞市骄阳交通设备有限公司 | 苏州交通设施_道路划线_停车场划线_厂区划线_环氧地坪厂家-推荐【飞扬市政交通设施公司】专注交通设施8年! | 泊头市天一泵业有限公司_齿轮泵,高粘度齿轮泵,螺杆泵,三螺杆泵 | 智能仓储货架厂家 - 汇峰仓储 | 摩托车-摩托车配件-摩托车与配件_摩托车与配件行业权威的门户网站! | 上海婺川实业有限公司 | 誉瑞仪器是全球知名检测仪器厂商RAE在华东地区的专业级产品销售及授权维修服务商- | 智能化解决方案 智能家居 家庭影院 灯光音箱 会议室报告厅 剧场剧院 指挥中心 大数据中心_沈阳天哲科技有限公司 | 西安鸿仁汇智软件公司是高新技术企业,专业为企业及高校提供智慧化管理一站式解决方案 | 桥梁伸缩缝_桥梁伸缩缝厂家_桥梁伸缩缝价格-衡水淞皓路桥养护工程有限公司 | 专注客流统计,客流分析,人流统计系统,客流计数器-广州市天威电子科技有限公司 | 南通市科脉电子科技有限公司| 家电|想认识品茶妹子?这份攻略手把手教你 | 混凝土布料机,隧道布料机,衬砌台车布料装置 - 河北聚力智能装备有限公司 | 燃气锅炉-供暖锅炉-热水锅炉-电锅炉-北京锅炉安装公司-北京亦辰科技有限公司 | 耐腐蚀磁力泵,直立式耐酸碱泵,立式耐酸碱泵,自吸式耐酸碱泵-杰凯泵业【官网】 | 芜湖藦卡机器人科技有限公司 | 三原图库 - 设计图片素材打包下载sytuku.com | 金相切割机-金相磨抛机-显微/维氏/布氏/洛氏硬度计-自准直仪-金相显微镜-万能材料试验机-清洁度检测仪-淋雨试验机-上海中研精密仪器制造有限公司 | 西安西雷脉冲功率技术有限公司-高压调制器/加速器与脉冲功率系统的研发/生产/应用推广/高压脉冲电源的应用研究/设计/生产和销售/高功率脉冲器件/材料与仪器设备的研发/生产和销售/高电压/大电流/强磁场环境的模拟及测试服务/会议会展服务/货物及进出口的业务/脉冲功率技术领域类的技术转让 | 直冷式块冰机|片冰机|块冰机|制冰机厂家|深圳市冰之星制冷科技有限公司 | 装修公司-吉诚装饰公司官网| 阻垢剂|缓蚀剂|杀菌剂|分散剂|水处理剂|印染助剂|水处理药剂|造纸助剂|膜阻垢剂|缓蚀剂|HEDP|ATMP|螯合剂-山东凯瑞化学有限公司 水处理药剂生产厂家 | 学汽修_汽修学校_汽修学校哪家好-江西万通汽车学院官网 | 欧式箱变_美式箱变_预制舱壳体-合肥龙马电气设备有限公司 | 汽车标签|医疗标签|电子标签|手机电池标签|电脑电池标签|电源标签|耐高温标签|防静电标签|手机出厂膜|手机全裹膜|手机包裹膜|手机卖点膜|热转印标签|遮阳板标签|天势科技|-标签印制专家! | 友信京泰-操作台-调度台-控制台-监控台定制厂家 | 容积式换热器,半容积式换热器-绍兴市压力容器有限公司 | 山东发电机组生产厂家,特种火花塞生产厂家,高压线生产厂家,空气滤芯生产厂家,济南市博盛动力机械有限公司 | 锯骨机-砍排机-全自动锯骨机-商用砍排机-切丁机 - 广州市九盈机械设备有限公司 | 制冷设备|冷库|空调|配件【制冷通】国内领先的制冷服务平台 | 净化塔_喷淋塔_脱硫塔_河北宝飞华创玻璃钢制造有限公司-河北宝飞华创玻璃钢制造有限公司 | 河北安润防腐管业股份有限公司-远程供液管路_远程供液_远程供液系统 | 山东万通液压股份有限公司-自卸车专用油缸,能源采掘设备油缸,机械装备用油缸,油气弹簧,工程机械油缸,液压元件 |