国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.lhp8.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4914

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线影音先锋 | 在线观看亚洲国产 | 中国美女牲交一级毛片 | 青青在线国产视频 | 中文天堂最新版www官网在线 | 免费黄色大片网站 | 一个人看的www的视频免费 | 拨牐拨牐永久华人海外网站 | 小小的日本在线观看中文 | 亚洲最大免费视频网 | 麻豆沈芯语 | 日日摸夜夜爽色婷婷97av | 97伦理影院| 老司机午夜免费影院 | 天天看片天天爽_免费播放 天天看片天天爽 | 在线观看免费视频 | 白丝丝袜美女被男人桶30分钟 | 打开双腿狠狠蹂躏蜜桃臀 | 美女脱了内裤张开腿让男人添软件 | 色多多视频在线观看免费完整版 | 午夜视频欧美 | 婷婷影院在线综合免费视频 | 天天看片夜夜爽 | 深爱婷婷激情网 | 天天碰天天摸天天操 | 99国产精品视频免费观看 | 毛片网在线 | 日韩欧美国产精品第一页不卡 | 日本高清在线一区 | 不卡一区在线观看 | 特色一级片 | 欧美深夜影院 | 天天综合久久久网 | 婷婷六月久久综合丁香一二 | 手机在线观看mv网址 | 欧美日韩视频一区二区三区 | 做a小视频| 久久亚洲影院 | yjizz视频最新网站在线 | 日本韩国欧美三级 | 欧美在线视频你懂的 |