Guangzhou Steel Structure Installation general steps (more detailed)

Time:[2016-4-6]  Hits:4906

Guangzhou Steel Structure Installation general steps (more detailed)

Guangzhou Steel installation general steps:
First, prepare the steel structure installation Guangzhou
(one). Ready to work
 1, the construction organization design and construction organization design of steel structure installation should provide a brief description of the project before, comprehensive statistical quantities, the correct choice of construction machinery and construction method, layout reasonable installation sequence, mainly installed elaborate technical measures, developed strict quality standards and safety installation standard, serious preparation of project schedules, workforce planning and materials supply plan.
 2. Check the pre-construction inspection of construction before the retest, including acceptance, construction equipment and measuring instruments and inspection of steel components based.
(1) Acceptance of Steel member steel members should be construction plans and specifications for acceptance. Steel member is transported to the site, the manufacturer shall provide factory certificate and the following technical documents:
 ① design and design modification documents;
 ② quality steel single or test report and supporting material;
 Test test data ③ high strength bolt friction coefficient;
 ④ plant one or two types of weld inspection reports;
 ⑤ steel members geometry inspection reports;
 ⑥ member list. Installation of this unit should be acceptance, and the actual condition of the structure retest. If the member is damaged in transit, require the production plant must be repaired.
(2) inspection before installation and construction equipment and measuring instruments for important hoisting machinery, tools, wire rope and other accessories shall be tested to ensure reliable performance have to ensure the smooth and safe installation. When installing the measuring instrument has to be regularly assigned to the National Bureau of Standards testing unit for testing, calibration, to ensure accuracy of the measurement standard.
 3, based retest. Steel is fixed in reinforced concrete base (base, capitals, corbels, etc.) on. Thus the base and anchor bolt accuracy, strength to retest. To retest the base level of the base surface elevation, roughness, horizontal position deviation anchors, anchor bolts embedded in the accuracy of the determination made. And the retest results and corrective require delivery of the base construction unit.
 4, preparation of installation plans and component supply plan, organize construction.
 5, check the steel components: Steel Factory member should have factory certification, drawings before installation press review enumeration member, the member is installed in accordance with the order arrived within the scope of the installation, without affecting the installation conditions as far as possible on the installation member lower position to ensure the installation convenience.
 6, installation of steel columns: first determine before lifting member hanging position to determine banding method, take appropriate precautions when lifting. After lifting steel columns when the column foot anchor bolt from about 30-40CM when righting the mounting bolt hole pedestal alignment, slow-fall in place. After the beginning of the school to be vertical deviation within 20MM, tighten the bolts temporarily fixed to decoupling.
 7, steel girder lifting: lifting steel beams after completion of the review column, lifting into place using two symmetrical banding installation hoisting steel beams. After lifting steel beams from the column reference plane 100MM slowly slowly in place, be adjusted to be corrected hoisting steel beams, then a fixed connection. With hanging with the theodolite corrected any time to correct deviations when hoisting steel beams.
 8, wall purlins installation: purlin cross-section smaller, lighter, and more using a hook or a hanging piece lifting method for lifting. Purlin correction is mainly the size and spacing of their own flatness. Check with the kind of pitch along the rod to move back and forth between the bar purlin members, subject to error, to relax or tighten the bolts corrected. Flatness ruler with cable and calibration checks, and finally bolted.
 9, the installation correction
 ①. Steel Column Correction: vertical steel columns correction theodolite or hanging wire hammer test, when the deviation is corrected using the jack, jack the base elevation correction a little elevation, and then increase or decrease the thickness of the plate, tightly immediately after the column foot correction is correct after solid anchor bolts, steel columns until the correct overall correction pouring fine stone concrete column under the soles of the feet fixed.
 ②. Steel Beam Correction: steel beams and vertical axis of the measurement correction, the correction performed using the jack, fixed immediately corrected.

 (two). Wall plate mounting pressure-type color
1. Preparation before construction
①, before the steel sheeting envelope construction and installation, custom corresponding construction drawings, and design and construction personnel training and production safety tests, according to the design documentation organization.
②, detailed check based on the file size and number of types of materials, damage to the pressure plate, flashing boards should be repaired and replaced.
③, various types of construction equipment should be complete, and can operate normally.
④, review and steel sheeting construction installation precision steel components relevant, clear coating installation weld spatter and purlins, and brushing the anti-rust paint for corrosion protection.
 2. Pressure-type color plate construction process: Siding installation by purlins from one location to start, must clenched between the board and the board, and then screws, drywall seams well water treatment. When the pressure plate is installed, it should be laid side edge to adjust its position, while fixed.
 (III). Floor bearing plate installation
 Before floor bearing plate construction, installation, drawing the appropriate row board diagram, according to the construction drawings. Pressure plate along one end of the floor to start laying, laying side edge to adjust its position, while fixed. Entrance case, install pressure plate, then cut the hole sizes according to the actual position of the hole.
 Second, the installation of steel Stability member monomer stabilization and structural overall stability
 1, the monomer component monomer stability stable member refers to a member at the site stack, from the pull, lifting, bending occurs in place during bending and torsion destruction and instability. Thus for thinner and larger member should consider this issue.
 2, the structure of the overall stability of the overall stability structure refers to the structure in the lifting process support system has not been formed, the structure must bear some of the load (including weight). Therefore, in the formulation of the lifting sequence must fully take into account this factor, to ensure that each step in the process of lifting the structure is stable. If the problem can be added other measures to resolve the temporary wind cable.
 Third, Guangzhou Steel installation and connection problems
 Live connection mainly ordinary steel bolts, high strength bolts connecting and welding.
 1, ordinary bolt connection, mainly used by ordinary bolt bending, pulling node. In the main bolt tension. Plus an appropriate prestressing, the shear structure are also used extensively for transmission towers and other connections. After ordinary bolt tightening, exposed threaded be not less than 2-3 button. Common locking bolt should measures, such as double-locking nuts or fastening nut. Bolt hole misalignment smaller reamer or rasp can be used to repair holes, gas cutting may not be used to repair holes.
 2, high-strength bolts, high strength bolts connecting ships directly for important structures to withstand dynamic loads in. Its main feature is to pass through the shear contact surface friction. Therefore, when high-strength bolts installed, practices and rough friction surfaces must be processed according to specifications. Secondly, also for the friction coefficient and torque coefficient test. When you install unscrew the torque to be measured at the beginning and end of the bolt screwing torque.
 3, site welding, site welding plant with welding inspection
 (1) the design of the site should be avoided in soldering
 (2) prevent the adverse weather conditions (rain, wind, cold climate) on construction
(3) reduce the adverse welding station (construction site operation can not rotate, only overhead welding, it is difficult to even settled welding personnel) influence in the process of lifting the steel should pay attention to the problem of the column, when the beam is installed, the main inspection horn column beneath the floor mat whether real, pad level, whether vertical column and the availability of displacement, the degree of vertical and lateral bending vector high primary and secondary beam. After the installation of steel structures formed spatially fixed unit and acceptance, it will require the construction unit in time and space column base plate top surface of the secondary concrete pouring compacting expansion. Finally, we need to check the verticality of the main steel structure and the whole plane bending

 Fourth, the preparation before lifting.
       When the manufacture of steel columns in the column axis design draw feet, on top of the cover shells on cross control lines, control and vertical axis of bolt installation quality control for lifting. Bolted steel construction for general use bolts and high-strength bolts. Ordinary bolts, each bolt end can not be more than two pads gaskets, not use gas cutting reamer bolt holes, bolts tightened after the exposed thread pitch of not less than 2; key control for high-strength bolts bolted rubbing treatment (sandblasted) , anti-slip surface friction coefficient, tightening sequences applied bolting, screwing early final twist, twist applied torque value, the value of the exposed threaded bolt, the gusset plate surface damage and deformation. Installation plate contact surfaces should be smooth, the contact surface must be greater than 75%, the edge of the gap is not greater than 0.8 mm, high-strength bolts should be free to penetrate not be beat and reaming; high-strength bolts shall not be used as a temporary installation bolt, bolt should one direction, bolt mounting every day should be a final twist is completed, a final twist after completion should be individually checked for less twist, super twist should be screwed up or replaced.
Steel Works important quality control points
Embedded quality embedded anchor bolts, anchor bolts directly affect the quality of the installation of steel structures, control bolt (group) position, squareness, length and elevation, and the reaming adjustment to reduce workload (even avoid rework), improve the structural quality of the installation is important. The method can be directly embedded anchor bolts embedded method may also be set aside hole method.
 Fifth, the steel works rainy winter construction measures
 (A) Construction in Winter
 1. Winter construction steel structure fabrication and installation of steel strictly enforced in accordance with the relevant provisions of Winter Construction.
 2. The steel components making positive temperature negative temperature installation should be considered when members shrinkage based on differences in ambient temperature, and adjust the deviation to take technical measures in construction.
 3. Participation negative temperature steel construction welders should be subject to a negative temperature welding technology training, examination, and obtain the corresponding certificate.
 4. The connecting material steel and related negative temperature used be accompanied by a certificate of quality, performance and product standards meet the design requirements.
 5. The negative electrode for use at a temperature more than two hours can not be exposed, more than two hours to re-baking electrode baking times no more than 3 times.
 6. flux prior to use in accordance with regulations baked to a moisture content of not more than 0.1%.
 7. The negative temperature high-strength bolts used shall have a product certificate, and at negative temperature coefficient of torque, axial force re-inspection.
 8. The negative temperature steel structure used coatings not use water-based paints.
 9. The next member feed, should be reserved for the shrinking margin, welding shrinkage and compressive deformation amount should be coordinated with the shrinkage of steel produced in the negative temperatures.
 10. member assembly, according to the order prescribed in the process from the inside out extended group fight, do weld shrinkage experimentally determined values ​​need to be reserved at the time of negative temperature group fight.
 11. component assembly, remove the seam 50mm memory remain rust, burrs, dirt, oil, snow and other debris, dry and free of residual moisture holding seams.
 12. The negative temperature should be at least 9mm steel plate welded to the multi-layer welding, weld surfacing from the bottom up layer by layer, each weld once finished welding, such as welding interruption before applying again to clear welding welding defects. Arc welding is prohibited on the base material.
 13. Steel-site installation, in case of snow or wind speed 6m / s or more, the erection of protective shed.
 14. eradicate substandard weld re-welding, steel welding process in accordance with the provisions under the negative temperature welding.
 15. When the ambient temperature is below 0 ℃, before brushing anticorrosive paint brushing process test, component surface rust, oil, burrs and other things necessary to clean up brushing clean, and keep the surface dry. Snow or ice may not work on brushing member.
 16. Winter transport, steel anti-slip measures taken when stacking, stacking space formation member firm no puddles, no freezing ground. When the same type of members are stacked, members should be kept level, horn on the same vertical line, and prevent slippery member.
 17. Installation according to claim former steel negative temperature conditions, their quality retest of the production and transportation of missed stacking member deformed, repair correction on the ground.
 18. Hoisting ropes should use anti-skid steel members plus septum, and at the same time lifting the gusset plate member, installers need to use the fixtures and other things with a rope lashing firmly.
 19. Preparation of steel components installation sequence chart according to the temperature conditions, in strict accordance with the provisions of the order will be installed during construction.
 20. Preparation installation of steel structures welding process, both ends of a member shall simultaneously be welded.
 twenty one. Before installing remove member surface ice, snow, dew, but not damage the coating.
 twenty two. Negative temperature installation of pillars, main beam immediately corrected permanently fixed position correction right now, the day of installation space member to form a stable system.
 23. The high strength bolt friction joint fitting member may not have snow ice surface, no contact with dirt, oil and other stolen goods.
 24. The negative temperature steel installation quality addition to complying with "Steel construction and acceptance norms" (GB50250-95) requirements, but also according to the design requirements for inspection and acceptance.
 (B) the rainy season construction measures
 1. Rain construction, erection of temporary protection should be shed, rain may not fall on a hot weld. The welding site is wet, wipe with a dry cloth and must be in before the welding with oxy-acetylene flame to dry, keeping the seams dry, no residual moisture.
 2. When lifting, the member if water should be cleaned before installation, but not damage the coating, high-strength bolts when fitting installation member friction surface should be clean, can not have drops, not rain and exposure to dirt and oil and other dirt.
 3. member rainy weather can not be brushing work.
 4. The rain and wind can not be more than five roof insulation construction.
 5. Because of the rain the air is moist, the electrode should be moisture storage and baked, repeat the same electrode baking times should not exceed twice by management in a timely manner grilled record.
 6. The case of windy weather, columns, beams, and other large supporting member should be corrected immediately, permanently fixed immediately after the position correction is correct, to prevent unilateral instability that day installation member, should form steric stabilization system.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 聚达|聚达物联|聚达物联科技|杭州聚达物联科技有限公司|www.judawulian.com|智慧社区|数字驾驶舱|智慧清运|智慧工地|邻家小达 | 拉力试验机|电子万能试验机|液压万能试验机|摩擦磨损试验机|济南试验机厂家-济南思达测试技术有限公司 | 长沙思辰仪器科技有限公司| 水处理设备_纯净水设备_软化水设备_反渗透水处理设备「陕西甘肃青海宁夏新疆」认准海川环保 | 箱式电炉,箱式烧结炉,箱式马弗炉,箱式实验炉,高温箱式电阻炉,箱式加热炉,箱式退火炉,箱式真空气氛炉洛阳研博炉业有限公司 | 康拓威技术(深圳)有限公司|Theia镜头代理商|安讯士AXIS摄像机|安讯士监控系统|博世BOSCH监控|博世会议系统|索尼SONY监控|松下PANASONIC监控|三星韩华SAMSUNG监控|霍尼韦尔Honeywell|海康|大华|华为监控|Theia无畸变镜头|AXIS监控|安讯视摄像机 | 山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋_山东汇河环保科技集团有限公司,水囊水袋,水罐,油囊,预压水袋,吊重水袋 | 台车炉厂家_台车式退火炉_台车式回火炉—安徽大新工业炉有限公司 | 泡酒配方大全-泡药酒专业的网站-泡酒之家 | 昆明集装箱-云南住人集装箱活动房厂家|移动板房出租赁定制 | 手术无影灯生产厂家-提供电动手术台,电动产床定制与批发-山东华辰医疗设备有限公司 | 有机肥设备|有机肥生产线|有机肥料生产设备|河南通达重工科技有限公司 | 邮政纸箱_淘宝纸箱_抗压纸箱,盐城纸箱,盐城纸箱厂家,盐城承重纸箱-盐城君雅纸箱 | 九江市新双龙广告装饰有限公司| 吉林人才网_吉林招聘网_求职找工作平台 | 心理咨询室设备_音乐放松椅_心理测评系统_情绪宣泄设备厂家 | 永康微网站建设、永康手机网站建设、永康营销型网站建设、永康外贸网站建设、永康网站托管、永康网络公司—英汇网络 - 永康市英汇网络技术有限公司 | 消防服_防化服_灭火防护服_消防装备生产厂家-泰州市华通消防装备厂有限公司 | 上海惠涵实业有限公司-德国进口风机,德国Elektror依莱克罗风机 上海画册设计-上海宣传册设计-产品手册设计-企业画册设计公司 | 智能访客系统 - 来访登记系统_微信预约系统_人员出入管理系统_访客机_人脸识别系统门禁闸机 | 葫芦岛装修公司,兴城装修家装公司,葫芦岛鑫昕装饰 | 线路板生产厂家|电路板快板打样|PCB工厂价格|江西锦宏电子有限公司|PCB版加工定制 | 抛丸机-H型钢结构抛丸机-钢板通过式抛丸机厂家-泓霖喷砂除锈设备 | 临沂网站建设,临沂网站制作,临沂网络公司,临沂小程序开发,临沂网站设计,沂水网站建设,沂南网站建设,蒙阴网站建设,平邑网站建设,费县网站建设,兰陵网站建设,郯城网站建设,临沭网站建设,莒南网站建设,兰山网络公司 | 木业信息网[www.wood186.com]全国木业建材服务平台 | 专注客流统计,客流分析,人流统计系统,客流计数器-广州市天威电子科技有限公司 | 太阳能路灯-高杆灯-景观灯-玉兰灯-中华灯-LED市电-庭院灯厂家-扬州汉威光电科技有限公司 | 欧美日韩人妻精品一区二区三区_欧美成人精品欧美一级乱黄_亚洲欧美日韩高清一区二区三区_国产一级做a爰片久久毛片_日韩一级视频在线观看播放_精品一区二区三区免费毛片爱_完整观看高清秒播国内外精品资源 | 真空干燥箱厂家-热风循环烘箱生产厂家-鼓风烘干箱价格-南京火燥机械科技有限公司 | 自建房外墙砖|地砖|墙砖,农村|别墅瓷砖-佛山燊陶丰 | 碳化硅脱硫喷嘴,碳化硅烧嘴套,碳化硅耐磨衬套-潍坊致达特种陶瓷有限公司 | 金酱酒_金酱酒代理加盟招商_OEM贴牌企业定制! – 金酱酒代理加盟!茅台镇较早的酿酒烧坊,年产优质酱香白酒5000余吨,仁怀市十强白酒企业,主营主品:金酱酒、金酱陈香酒、酱香老酒等系列品牌产品 | 易众拍卖行-事故车拍卖,残值车拍卖,水淹车拍卖,全损车拍卖,修复车拍卖,碰橦车拍卖,瑕疵车拍卖,报废车拍卖,泡水车拍卖,拆车件拍卖,配件拍卖,火烧车拍卖,二手车拍卖专业线上平台 | 行域人才网-垂直行业领域招聘首选的专业人才网,分行业招聘就上行域人才网 | 中国焊接协会网站—中国焊接信息网;焊接行业最权威访问量最大的专业网站:焊接信息、焊接材料,焊接机器,焊接设备,焊机,焊材,辅助设备,焊机配件,仪器仪表,电动工具,钎焊,送丝机,表面处理,自动化专机,焊锡丝,助焊剂 | 中华收藏网-中藏网-藏品拍卖|字画拍卖|艺术品拍卖|古玩城|收藏资讯|古玩交易|书画定制 | 压瓦机|C型钢机|彩钢设备|C/Z互换檩条机-河北玉发压瓦机 | 数控钢筋弯箍机_数控钢筋弯曲中心_数控钢筋笼滚焊机厂家_山东佳信 | 中山电子控制板|中山工业控制板|中山市云禾电子科技有限公司 | 无锡双海金属科技有限公司[官网] | 品牌策划-品牌设计-济南之式传媒广告有限公司官网-提供品牌整合丨影视创意丨公关活动丨数字营销丨自媒体运营丨数字营销 |