Guangzhou Steel construction technique which span a large space?

Time:[2016-4-20]  Hits:4423

Guangzhou Steel construction technique which span a large space?

 

Guangzhou Steel Slide the laws generally can be divided into two types: structures by supporting sliding method. The following were introduced Guangzhou Steel construction features of the two methods.
 
Slip Method: The basic idea is to structure the whole (or partial) in the first assembly with the conditions of the site assembly forming, re-use sliding systems designed to shift the overall position of installation method. With this installation technology, assembly site and assembly machinery and equipment can be focused on a relatively fixed venues, as compared with in situ mounting method can reduce the amount of temporary support measures and operating platforms, space-saving processing and management costs. First with the structures by which key consideration in the design of the structure of direct construction difficult position, for example outside the periphery of the construction site is limited, can not meet the normal walking across the inner lifting equipment. The basic elements of this construction method is to "enhance the overall engineering," the assembly ground reaction force support, enhancing the overall replaced by "lateral movement", so essentially the same method to enhance the work.
 
At the same time, using this method should at least pay attention to several points: a support structure at the slip in favor of laying the track, slip line length, the higher the efficiency; slip unit should geometric invariant system, slip process is sufficiently rigid and stability, resistance to minimize slippage when. When using multi-point traction slip is achieved, in order to avoid twisting structure during sliding, traction synchronization must be controlled if it is difficult to ensure that, should fully assess the impact calculated by the traction unit is not synchronized to slip caused when necessary, temporary reinforcement of the slip unit. Slip unit before the final fixed structure exists in a direction orthogonal to the direction of movement of "easy slip" trend, because the conditions are different and the design of supports, designed to prevent the outside (ie, the slip plane) of the deformation, it is necessary to take prevent the "fall" of measures, such as setting a rigid rod or flexible cable from the balance on both sides of the support nearby.

In addition, the structure of sliding method further comprises two different processes: Pin slip by, the cumulative slip.
Pin slip by: the slip unit or a Pin Pin composed by a number from one end to the design position, between the sliding unit at high altitude were connected directly to form a unitary structure.
Cumulative slip: slip upcoming unit on the rail just slip some (temporarily moved to the design position) to be connected to the next unit and then slip a distance, and so forth, by Pin accumulated until each unit Pin push to the design position.
In general, large-span space steel structure and installation method, can not be set when the temporary support or the use of a crane to install the poor, that is, direct construction of buildings at the position in question, Slip engineering methods can be used as solutions one.
Supporting sliding method: sliding method is supported in the structural design of the Group erection support frame structure in place in order to provide support for installation and operation of the platform, to be part of the structure of the installation is complete, the support that is already installed sliding structure Bi out. Such is the structure of the adjacent in-situ installation created the conditions, and so on, until the completion of the structure of the overall installation. Thus, with different structures by supporting sliding method can be summarized as "structure does not slip and slide support mechanism" and Slip law is "structural support mechanism does not slip and slide." When using the support sliding method, in addition to the support structure is designed to meet the general global and regional stability, but also consider the level of dynamic load (start-up and braking effect caused by the horizontal inertia force), can be added a large brace if necessary to improve its anti lateral stiffness. To sum up, since this method to be occupied structure across the venue, so when the surrounding environment is difficult to provide a splice site structure supporting sliding method can be used as one solution. It is worth noting that, regardless of the support structure or slip slip method, the sliding track in addition to the conventional linear translation, the slip curve is also not uncommon, frequently used in engineering practice.
 
Enhancing the overall installation method: Installation method to enhance the overall structure is to be installed on the ground floor or a suitable projection assembly forming position, and then use the "lifting system" will enhance the overall upward to an installation method of shaping the design elevation structure. When large-span steel structure height is higher, not conducive to the erection of supporting tire rack, lifting steel shape rules, enhancing the overall construction methods can be employed as an option.

Large-span steel structure cantilevered unsupported installation method: the so-called large-span steel structure cantilevered unsupported installation method that is not in the erection of the support mechanism of the conditions to the stiffness of cantilevered steel body based on the use of mechanical lifting at height parts installation, use and gradually extended phase of the installation way for construction. Relatively high altitude in situ installation method, although the labor law is also in the vicinity of high-altitude Situ installation, but does not entirely because of the temporary support mechanism, measures less construction, the construction process is simple (no unloading). Suitable structural body stiffness, good stability, high height cantilevered steel. With this construction method, by the influence of its own weight, will be cantilevered section under torsion, and the resulting problems is to install the coordinates of an unknown member of the encounter when the mounting position or shape required the presence of the closure case, the bit configuration of the construction process shape control is one of the biggest technical problem, which is directly related to the construction field configuration when completed can meet the requirements, and the cantilevered section smooth closure.
 
Guangzhou Steel for large-span steel structure construction, the original high-altitude air unit installation method, slip mounting method, enhancing the overall law and large span cantilever mounting method is currently unsupported several typical and common construction methods, but its application must grasp conditions and key technical points, in engineering practice, a reasonable choice. Especially in recent years, most of the projects has a unique architectural style, bring many difficulties to the construction in particular installation. A deep understanding of the structure of the composition of these projects, to understand its load transfer path, familiar with the specific requirements of the project area where the ambient conditions and the engineering, construction and available resources and master their own proprietary technology to local conditions to design the most appropriate , get rid of the installation program, it is the pursuit of the highest level of construction technology.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 深圳沃亚游学官网丨国外游学丨国际夏冬令营丨美国游学线路丨出国短期游学丨亲子海外游丨游学咨询: 0755-83843308 | 自动龙门裁断机-四柱|液压裁断机-吸塑裁断机-东莞市源德机械科技有限公司 | 洒水车_水车_洒水车价格_喷水车_绿化喷洒车_绿化洒水车- 程力专用汽车股份有限公司 | 起名字典|宝宝新生儿男孩女孩起名免费网-诗经周易生辰八字取名字大全 | 河北太尚园林-太尚雕塑厂家_石雕_不锈钢雕塑厂家_铸铜雕塑_雕塑设计定制 | 首页|广东蒙泰高新纤维股份有限公司|丙纶细旦丝|丙纶异形丝|丙纶FDY网络丝 - 广东蒙泰高新纤维股份有限公司 | 液晶模组铁框_液晶显示压框-南皮县卓腾金属制品有限公司 | 全球石油化工网 - 石油化工资讯,石油化工机械,石油化工设备,石油化工贸易,石油化工技术,尽在石油化工网 | 铸铁型材_灰铁棒_球铁棒_圆铁棒生产厂家★河北起昌精密装备制造有限公司 | 昆明塑料包装袋|云南塑料包装袋|昆明塑料袋厂家|云南茶叶大米蔬菜种子食品包装袋就来阮门包装有限公司 | 直流屏|青岛直流屏|直流屏电池-世界500强艾默生直流屏标准生产厂家赛里斯能源科技有限公司 | 湖北江南专用特种汽车有限公司官方网站 | 交通标志牌-交通标牌-铝圆牌-铝三角片-铝滑槽-公路警示指示牌-方牌-高速道路反光牌毛坯-交通设施安全警示标识牌-路名指示限速限高牌-厂家加工交通标牌铝板半成品毛坯-上海吕盟铝业有限公司 | 上海新航道学校官网_20年专注雅思_托福_SAT_ACT等出国语言培训机构. | 中婴网,推动母婴产业健康·可持续发展,婴童网络专业传媒,母婴网,360孕婴童网,婴童品牌,婴儿用品品牌,婴儿用品加盟店,母婴用品加盟店 | 泉州小吃培训_福建泉州本地特色小吃培训班|厨师技术培训学校-魅力小吃培训服务机构 | 浙江微龙科技-微通道工艺结合设备一站式解决方案-致力于连续流技术开发与产业化应用-助力传统医药化工行业转型升级 | 清关公司_进口报关公司【恒邦】进口报关流程及费用 | 健力普医疗-半导体激光治疗仪,红外偏振光治疗仪,近红外线治疗仪-独家功能,光疗典范 | 专业生产安检门-X光机-防爆罐-金属探测门-中警思创军警装备厂家 专业色素炭黑生产厂家,提供各种用途色素炭黑价格-枣庄鑫源化工 专业护工_医院护工_护工陪护_住家护工- 心陪护 | 铸铁型材_灰铁棒_球铁棒_圆铁棒生产厂家★河北起昌精密装备制造有限公司 | 江西省屹诚建筑装饰工程有限公司 | 兰州钢结构,甘肃铝镁锰板工程,青海岩棉复合板厂家,宁夏岩棉彩钢板公司,西宁彩钢夹芯板-兰州腾达彩钢 | 上海慧泰仪器制造有限公司_一体型马弗炉-可控真空干燥箱-强光稳定性试验箱 | 化工网-化工新闻资讯平台-中华化工行业门户网站 | 中捷摇臂钻,数控钻床,沈阳中捷设备机床厂官网_沈阳中捷数控摇臂钻床厂 | 皮带输送机(输送机械)-带式输送机-皮带输送机生产厂家-河南坤威机械 | 河北徐工鲲鹏工程机械有限公司无锡分公司 | 塑胶跑道厂家_河北小区健身器材_悬浮地板-河北达创体育器材有限公司 | 夏令营报名中心-军事夏令营哪家好-青少年夏令营推荐-中小学夏令营活动-夏令营报名中心 | 数控立式车铣复合加工中心_数控立车_卧式加工中心_阀门专机-华电数控 | 品润财税_广州公司注册_南沙代理记账服务_危化证出口退税外国人工作签证代办 | 热熔钻孔机【优质厂家】_多年热熔钻设备研发制造经验 | 天之水网_新时代主流门户网站 十大文明网,主流新媒 、 值得信赖、关注我、温暖你! | 石材雕刻机_墓碑雕刻机_木工雕刻机_雕刻机厂家-合肥沃力数控设备有限责任公司 | 养殖污水处理设备厂家-废水处理设备-固液分离设备-诸城市赛瑞环保 | 环保除尘设备_燃气/燃油热水锅炉_光氧空气净化器_蒸汽玉米压片机_压片设备_烘干设备-山东金盾节能环保设备有限公司 | 铝合金线棒生产厂家-提供第三代精益管,防静电工作台定制与批发-宁波杰艾逖仓储设备有限公司 | 济南排队机,济南触摸屏一体机,济南拼接屏广告机厂家,汇通视控 | 养殖污水处理设备厂家-废水处理设备-固液分离设备-诸城市赛瑞环保 | 惠普工作站_联想工作站_HPE服务器_H3C服务器-河南金铭科技有限责任公司 |