Foshan main steel members (b)

Time:[2016-5-14]  Hits:5289

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久精品久久精品国产大片 | 一二三四免费观看高清观看在线 | 在哪里看毛片 | 色综合网天天综合色中文男男 | 青春草在线视频免费观看 | 免费涩漫 | 欧美色香蕉 | 欧美精品va在线观看 | 欧美5g影院天天爽天天看 | 给我免费播放片在线观看 | 日本视频在线观看播放免费 | 热热99| 3d同人18av黄漫网站 | 欧美a一级 | 超碰最新地址 | 久草中文在线观看 | avtt国产| 日韩高清在线免费观看 | 久久久精品国产免费观看同学 | 全黄一级裸片视频免费区 | 日本无遮羞调教打屁股 | 久草免费福利资源 | 公交车上开嫩苞小说 | 扒开腿露出尿口扒开来摸 | 色网站在线播放 | 91综合久久久久婷婷 | 中文字幕亚洲第一 | lomando恐怖网站进入信息 | 青青青草视频在线 | 青青青草影院 | 一级强女尸片免费观看bd | 日韩欧美黄色 | 77yyzz男人的天堂 | 日本无遮羞调教打屁股 | 超级乱淫黄漫画免费 | 草莓视频污黄色 | 青娱乐极品视频在线 | 青春草久久 | 殴美一级 | 91久久国产综合精品女同我 | 啪啪综合 |