国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Dongguan steel reinforcement steel floor plate and requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.lhp8.cn

Dongguan steel reinforcement steel floor plate and requirements

Time:[2016-5-18]  Hits:4542

In the era of rapid development of steel structure in Dongguan, Dongguan, steel reinforcement steel floor plate for a lot of people more and more attention, then Dongguan steel floor plate reinforcement there how kind of request? Now, let Foshan Katsukuni explain to everyone under

1, composite slab anisotropic plate, judgment is one-way or two-way plate plate to anisotropic coefficient, calculated according to the effective anisotropy coefficient (conversion) side, according to the effective edge is longer than the judgment one way or the board two-way plate.
 
2, it is determined way slabs, reinforced with vertical ribs in the direction of the crest, along with the direction of the ribs in the trough, but it should be noted that there should be not less than 20mm protective layer, the protective layer is mainly to ensure the reinforcement of adhesion. Resistance is calculated vertical direction rib thickness as the thickness of the concrete above the ribs, the ribs along the direction from the trough date, the composite slab thickness thickness.
 
3, the extension of the rib along the direction of the pressure plate (the pressure plate in terms of reinforcement) as normal section bearing capacity to meet the requirements, and to meet the requirements of the shear bond bearing capacity, can not deserve reinforcement along rib direction. Special attention should be calculated shear bond capacity, it is generally a combination of shear bond floor control. "High Steel regulation" does not shear bond calculations, this is negligence.
 
4, if the calculated way slabs, steel must be configured at the peak, the pressure plate does not have any role in the direction perpendicular to the ribs.

5, the overwhelming majority of unidirectional composite slab plate, very special, such as corner boards may be two-way, because there is generally oblique beam span is very small, not calculated according to other parts of the same basic configuration to meet.
 
6, the top rib distribution must meet GB50010 requirements.

7, along the direction of the beam at the support rib is continuous or articulated, it does not depend on the pressure plate, but on the negative moment steel, pressure plate pressure is negligible. Vertical rib direction generally considered to be articulated, but it should be configured cracking structural reinforcement.

8, Dongguan composite slab steel studs are not required by the composite beam design, but must have a certain structure in order to ensure the integrity of the peg plate and beam.

9, if it is designed to beam, secondary beam is generally calculated by the composite beam, main beam (frame beams) should not be calculated by the bearing capacity of composite beam, since the frame beams bear repeated loads, composite beams no seismic test report - This specification is ignored the, GB50017 and GB50010 different, GB50017 no content seismic. In the case where the main beam load deflection can be checking by the composite beam (if they meet the requirements of composite beams).

10, SPA2000 can be selected directly pressure plate combination plate.

These are steel Foshan Katsukuni we summarize Dongguan steel floor plate reinforcement issues and requirements, hope to help combat, extended reading (Foshan Steel members mainly work)

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 全自动码垛机械手,码垛机器人,拆包机,缠绕机,开箱封箱装箱机厂家-山东昊宇自动化设备有限公司 | 上海企业团建|上海团建|上海团建活动|上海拓展培训|上海拓展训练|傲朗企业管理顾问(上海)有限公司 | 精馏塔_甲醇回收塔_糠醛塔-无锡弘鼎华化工设备有限公司 | 网带窑,催化剂网带窑,电热回转窑-淄博圣元窑炉工程有限公司 | 专业无机盐,化工产品检测公司,水处理剂检测公司,第三方水质检测机构—准诺检测 | 转轮除湿机,转轮除湿机,恒温恒湿机厂家_合肥铂克环境设备有限公司 | 履带底盘-橡胶履带底盘-无线遥控底盘-德州力维智能装备有限公司 铝压铸件_铝合金压铸件_铝合金压铸件厂家-安平县长虹压铸厂 | 铁盒|铁罐|马口铁盒|马口铁罐|茶叶铁罐|铁盒-麦氏罐业 | 正宗舌尖上的卤味卤菜卤肉卤水熟食的做法及配方大全网 | 联想南京总代理-联想服务器|联想电脑笔记本代理商|联想工作站|dell服务器|HP服务器|南京IBM代理商|IBM V5000存储总包销-南京宇宽科技有限公司 | 吉安仁济医院「官网」吉安男科医院-吉安仁济男科医院靠谱吗-男性专科医院 | 济宁山银煤矿机械有限公司,钻采工具,防爆电器,凿岩机械,风动工具,矿山机械,建筑机械,支护设备,通风防尘,铁路设备,仪器仪表,大型设备,矿用泵,钎具类,消防类,矿车类,配件区类 | 校园防欺凌|视频一键式报警器|防霸凌报警柱|停车场语音对讲|商铺联网报警|应急广播音柱|居家养老一键通|盾王可视联网运营中心 | 通用变频器|国产变频器|深圳变频器厂家-深圳市英捷思技术有限公司 | 苏州拆除公司_太仓拆除公司_常熟拆除公司_昆山拆除公司--苏州伊诺尔拆除工程有限公司 | 郑州环球重工机械有限公司建筑垃圾处理专题网站 | 美国SI中国区总代-北京开源国创科技有限公司 | 欧式箱变_美式箱变_预制舱壳体-合肥龙马电气设备有限公司 | 金相切割机-金相磨抛机-显微/维氏/布氏/洛氏硬度计-自准直仪-金相显微镜-万能材料试验机-清洁度检测仪-淋雨试验机-上海中研精密仪器制造有限公司 | 河卵石制砂机|鹅卵石制砂机-移动制砂机-制砂设备-郑州秦星机械设备有限公司 | 软化水设备_锅炉软水设备_全自动软化设备【安装维护、更换树脂】-青岛水处理设备厂家 | 全球无人机网(81uav.cn)_无人机买卖、租赁服务、培训的最大门户网站 | 自动烘干线,工业烘箱生产厂家-湖南耐美特智能装备有限公司官方网站 | 小型环境空气质量连续监测系统-烟气排放连续监测仪(碳排放)-青岛明德环保仪器有限公司 | 锌钢护栏,铁艺护栏,围墙护栏,锌钢围墙护栏,铁艺围墙护栏-互润金属丝网厂 | 门禁控制器-自动道闸-停车场系统-车位引导系统-车牌识别系统-楼宇对讲-可视门铃-门禁一卡通-河北京鹏电子科技有限公司 | 砂基透水砖滤水率,防滑性试验仪,砂基透水砖落球冲击,抗冲击试验机-献县中正试验仪器销售处 | 江门市东信科技 - 江门小程序开发,江门网站制作,江门软件开发,江门app开发 | 暖通家-中国暖通空调及热泵产业资讯平台,专业为厂家和商家提供价值服务 | 阻垢剂|缓蚀剂|杀菌剂|分散剂|水处理剂|印染助剂|水处理药剂|造纸助剂|膜阻垢剂|缓蚀剂|HEDP|ATMP|螯合剂-山东凯瑞化学有限公司 水处理药剂生产厂家 | 江西省力速数控机械有限公司丨火花机丨龙门加工中心丨镜面火花机丨卧式加工中心 | 黄山澳盛源新材料科技有限公司| 湖南长沙手术室、实验室、无尘室、洁净室、无尘车间的净化工程装修公司-福临建设 | 青岛相控阵检测_无损探伤检测机构_相控阵超声检测公司-青岛发现检验技术咨询 | 油罐_双层油罐_双层油罐厂家|值得信赖-泰安晟鼎金属容器制造有限公司 | 联想南京总代理-联想服务器|联想电脑笔记本代理商|联想工作站|dell服务器|HP服务器|南京IBM代理商|IBM V5000存储总包销-南京宇宽科技有限公司 | 胜亿网-专注B2B电子商务,为企业提供一站式网络服务 | 取样冷却器-射水抽气器-锅炉炉水取样冷却器-连灵动 | 浙江欧诺机械有限公司| 驾驶洗地机|手推洗地车|天津洗地机|扫地车|仓库工厂扫地机|工业吸尘器|扫雪机|耐洁思 | 液体灌装机_全自动灌装机_大桶灌装机_200L灌装机_涂料油漆灌装机-昆山灌装自动化设备有限公司 |