Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4923

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 久久不卡精品 | 亚洲人成www在线播放 | 拍摄国产两个女同磨豆腐 | 欧美一区高清 | 伊人婷婷色香五月综合缴缴情小蛇 | 中文国产成人精品久久96 | 亚洲国产精品久久 | 伊人精品视频一区二区三区 | 青草视频在线观看免费 | 日本xxxx69老师 | 日本成人免费在线观看 | 一二三四社区在线视频观看 | 亚洲tv精品一区二区三区 | 久久久全国免费视频 | 欧美一卡二卡3卡4卡无卡免费 | 91麻豆传传媒波多野衣久久看 | 在线视频污| 欧美最猛性xxxxx图片 | 亚洲欧美日韩高清一区二区一 | 23部禽女乱小说 | 污污视频在线播放 | 猫咪免费人成网站在线观看 | 欧美综合在线视频 | 日韩爱爱视频 | 免费成人高清在线视频 | 么公的好大好硬好深好爽在线视频 | 91色国产在线观看 | 天堂资源中文官网 | 中文字幕成人免费视频 | 欧美一级片 在线播放 | 久久精品中文字幕免费 | 欧美亚洲欧美日韩中文二区 | 天天操中文字幕 | 美女被人操 | 免费xxx8888| 午夜免费毛片 | 日本高清视频网址 | 影音先锋亚洲综合小说在线 | 视频二区在线观看 | 日本一卡二卡三卡 | 俺去啦婷婷 |