Precautions Foshan Steel Design

Time:[2016-6-15]  Hits:4732

Followed by the State to vigorously promote Prefabricated construction today, Foshan steel construction and more subject to our attention. The following are some of Foshan Steel watch point plan for us to see.
A Frame
⑴ portal frame should first determine whether there is a crane, such as plant demand resettlement process requests crane, you should note the following: ① column foot should be planned into a rigid column base; ② column should be planned into uniform section column; ③ between support columns by longitudinal horizontal crane load control programs, rather than a simple construction planning, when there are no less than 5 t crane when, should use steel support. As no crane portal frame, press columns and other practices planning a wedge, not repeat them.
Room ⑵ column support resettlement
Between the columns support the roof support pillar should be placed in the same room, so that the formation of a stable system of longitudinal frame, frame means to facilitate and increase the longitudinal stiffness. Support should be placed between the top of the second column by column from time to time, when placed in the second inter-column list when the appropriate placement of a rigid column tied, and the rigid tie rod and the wind column longitudinal orientation together, make a direct transfer wind loads. The turning point in the frame (single-span roof of the house and column capitals and some centers and multi-span pole in the house and the roof) should be set rigid Tied houses along the entire length. When larger span gantry in place between support columns should be appropriate to increase the number of rigid tie rods that support the angle is about 45 °. When the construction of functional constraint that can not be disposed between the support column, should be placed longitudinal frame. And that they've done this to make a rigid connection between the end of the column beams, studs and then cancel the support of engineering, construction make placement more flexible, with good results.
⑶ roof and wall construction
Roof and wall construction approach is to increase the stiffness of the frame, the key way to avoid the outer frame plane instability. Purlins, wall beams generally composed of cold-formed thin-walled structures formed when the column spacing less than 6 m, when designing a brace, more than 6 m, located two brace. Here should be mentioned especially the oblique bars, school diagram process, we often see a lot of steel structure manufacturers or planners provided the oblique strut bar without setting conditions. Factor is the construction concept is not very clear, because after construction mechanics, disposed between the oblique strut bar, before the formation of a stable system. In the roof, walls planned resettlement should also be noted bracing, bracing is not a luxury it is to avoid perverting the compression flange provided. Studies have shown the first portal frame damage due to pressure caused by perverting the largest flange. Oblique inner flange beams converge at the column flange and frame is the emergence of perverting vital parts, there is provided bracing is very important. In addition, the "portal frame light house steel construction technical specification" CECS102: 2002 (hereinafter referred to as CECS102: 2002) rules: oblique beams in the bottom flange of the compression zone is also set bracing, a distance not greater than the corresponding compression wing edge width of 16 (235 / fy) 0.5 times. When you press a general portal frame, purlin distance of about 1500 mm, a spacer is provided a bracing purlins above conditions can be satisfied.
⑷ shear key
"CECS102: 2002" rules: column anchor should not be used to withstand the horizontal shear column foot portion, the horizontal shear force by friction between the floor and the concrete foundation (friction coefficient desirable 0.4) or set shear joints bear. This is the time of our accounting mast, usually displayed warning: "Let Shear pedestal demand!"
Analysis of these factors, the main door is made generally lighter weight structure, column friction soles of the feet and between the concrete foundation is small enough to resist lateral wind loads and seismic effects, it should set the shear key. Usually the shear key beam with angle iron or steel, the shear bearing capacity of the cross section of the weld should be accounted for, columns and soles of the feet of open space between the surface of the foundation secondary grouting. Specifically refer to "many high-rise residential construction steel structure node configuration detail" 01SG519 diagram on page 30 to gather a large sample 1,2 practices.
Means for positioning the column anchor ⑸
This is the planners generally ignores questions and anchors positioned in engineering practice inaccuracy or rigid frame construction of the device difficult project case everywhere, we also encountered such a situation, and later had to reinforcement. Analysis of factors, notably the non-convergence between the anchors, the overall stiffness of the poor in the process of pouring concrete in the anchor inevitably shift. In response to these factors, taken before pouring concrete column anchor embedded fixation process, the specific approach shown in Figure 1. Mounting bracket and bolt to form a small lattice columns, positioned so the anchor would facilitate accurate. ⑹ wind columns and frame the current convergence of wind portal frame column planning practice there are two mistakes: one is the wind column and frame made of the same wind columns and beams or hinged frame or just then, the wind column to both wind and participate vertical load effect and the effect of the horizontal level. The planners do not usually do such a frame of longitudinal wind checking. This is done omissions load, Project Planning is a taboo. I think you are a force bent structure that clearly should not complicate it by force. This approach is defective; Another approach is to wind column and frame on one axis, but do not think that wind column vertical load effects wind between columns and beams with a steel frame after welding joints connected. This practice is still a part of the vertical load transmitted to the column of wind, and the steel sheet is small lateral stiffness, vertical load at the onset of the effect is difficult to ensure that there is barely after the land transfer the wind load. These two approaches have disadvantages. Here we recommend the following practices:
Plant selection do legal grids, Pin top frame column axis wind shifted 500 ~ 600 mm, wind through the column flange adapter plate is connected to the frame beam stiffeners and plate convergence and vertical stiffener open a long hole, use an ordinary bolt adapter bolts approach shown in Figure 2. Figure 2 wind column and frame adapter bulk sample
Plan 2 steel structure
Select ⑴ steel building systems
Common constructions of steel construction system can be divided into pure and construction - support systems into two categories. Highly selective and construction material systems, the use of closely-related features. This requires the construction engineer should work closely with the architect, when the construction of functional constraint can not be set because the support system should be used pure structure. Pure system configuration because no anti-sway support, two vertical and horizontal directions to satisfaction, "the construction of earthquake planning standards" GB50011-2001 (hereinafter referred to as "anti-regulation") Section 5.5 of the elastic layer between the displacement angle less than or equal request 1/300, beam the column in vertical and horizontal directions should just pick; because of "anti-regulation" section 8. 3.4 rule: "when the column in two mutually perpendicular directions and beam rigid connection, should use box-section" Therefore, use of pure construction system, usually planning to box column column column inside the box but the process of applying rust and proper maintenance difficult, which is steel construction planning a major problem. They are also trying to choose the column method of pouring concrete in the plan, but because the box column separator disposed stiffening node area, pouring concrete very difficult; on the other hand, the country is still in the concrete pipe during the discussion, common planning software can not be accounted for accounting theory in the Journal of the different. Based on the above factors when planning constructions of pure steel, most still use non - concrete box section column. Own labor process selected word column strong and weak axes are rigid convergence algorithm, according to the "anti-regulation" section of Article 8.3.4 of the text is selected, "should", see also the mainland large selection of drawings and Planning Institute said planning in spreadsheets method, but calculation results are not satisfactory, the elastic layer between the weak axis direction displacement angle is still unable to meet the request, "anti-regulation" of Article 8. 3.4. Because the box column in the structure of some tough, so the idea when planning a multi-layer steel cylinder-shaped house built try to use planning to construct - support system. Construction engineers and construction division to coordinate as much as possible, through resettlement in demand resettlement support bearing floor, elevator, which do not open big hole in the wall to achieve the support of stealth. The results indicate the accounting practice engineering, construction support displacement control effect is very good, so that in addition to the choice of column-shaped material saving, anti-rust, the use of easy maintenance, easy convergence weak axis direction, it is a useful method.
⑵ node Planning
Steel structure node planning is the key to planning steel structure. Hinged nodes simple, clear contact mechanics, where not too much to say, just focus on what connected node planning. Moment resistant convergence plan, "anti-regulation" 8 3.4 Recommended use Standard Figure 8. 3.4 - The node 1 in the form, in engineering practice are mostly chosen is such a node. This node has two accounts in accordance with: accurate programming and general programming. The difference between the two is that the former Reflections bending and shear webs, the latter only ponder web shear. Accurate planning law planning in practice, difficult bending webs satisfied request must be thickened to a large extent the web. The approach is very thick web of economic, so most use common project planning method, this accounting model Mechanics clear, simple accounting, but must pay attention to planning to take measures to strengthen the earthquake, such as the use of the plastic hinge relocation enhanced convergence or end of the beam away from the beam ends not far from the upper and lower flange beams weaken dog bone convergence. This is because, in the end without any reinforcing beam flange case, only ponder web convergence shear bolts bear, bear moment by the flange weld, then weld flange flexural capacity of only about 80% capacity BEAMS (that is, only beams with the section modulus of the beam flange section modulus of about 80%), then press the "steel construction planning standards" on page 3. 2.2, thinking construction site conditions weld strength reduction factor 0 is multiplied by the value of planning. 9, then the flexural capacity of the beam flexural capacity of Cohesion only 70% to 75%. This strong convergence node ratio is even lower 30% to 25%, in violation of the "earthquake not fall," the basic principles of earthquake "strong nodes, weak bars." Based on the above factors, it should be used "many high-rise residential construction steel structure node configuration detail" earthquake shown on page 19, 20 01SG519 portfolio strengthened approach.
Else
In our "anti-regulation" and "the Rules" the rules were not steel structure seismic level, just 12 minutes and 12 layers or less standard and two or more layers. I thought it was relative to our vast big difference around the fortification is characterized by inappropriate. Old "the Rules" in the multi-set size of a house built high-rise steel expansion joints no rules, only single industrial plant made some rules. These two points are the conceptual big question, "the Rules" does not emphasize these two points is appropriate.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 深圳人才网_深圳招聘网_【官方网站】 | 吉安仁济医院「官网」吉安男科医院-吉安仁济男科医院靠谱吗-男性专科医院 | 贴片磁胶电感_一体成型电感_贴片共模电感_广东精密龙电子科技有限公司 | 厦门空压机-厦门空压机出租-厦门钻机出租-厦门岩立盛机电设备有限公司 | 信管飞软件官网 - 亚拓软件旗下精细化管理软件、进销存管理软件、混凝土ERP、通风设备ERP、风管报价软件、出纳软件、送货单打印软件、ERP软件等免费下载 | 昆明护栏网厂家_隔离栅_围栏网_石笼网「13年生产经验」-云南北辛商贸 | 全球无人机网(81uav.cn)_无人机买卖、租赁服务、培训的最大门户网站 | 雨量计,翻斗雨量计,声波雨量计i,时差法流量计,时差法明渠流量计 - 徐州伟思水务科技有限公司 | 神魔录官网 - 收藏网址的地方,也是防骗小知识分享的地方 | 市南人才网_市南招聘网_求职找工作平台 | 交通标志牌-交通标牌-铝圆牌-铝三角片-铝滑槽-公路警示指示牌-方牌-高速道路反光牌毛坯-交通设施安全警示标识牌-路名指示限速限高牌-厂家加工交通标牌铝板半成品毛坯-上海吕盟铝业有限公司 | 煤泥烘干机,酒糟烘干机,药渣烘干机,酵母烘干机,烘干机厂家-瑞奥新能源 | 微型电磁阀_隔膜泵_活塞泵_微型水泵_微型真空泵_微型气泵【东莞市宗旨电子科技有限公司】 | 网站制作-网站制作公司-专业制作网站【做网站找企术】 | 山东华德耐特工业设备有限公司-仓储货架-钢托盘-物流车-周转箱-工位器具 | 宿迁市华泰交通设施有限公司,上海第四代路名牌,天津仿罗马柱路名牌,标准路名牌,路名牌灯箱,公交站台,户外广告灯箱, 交通标志牌,社区阅报栏 | 原子灰厂家—长兴宝迪环保科技有限公司【官网】 | 新乡市大成数控机械有限公司 | 模具架,模具货架,抽屉式模具架-模具架厂家 | 聚氨酯碰头,聚氨酯托辊,聚氨酯地辊/地滚轮/地轮/托绳轮-济宁卓力聚氨酯制品有限公司 | 食用油灌装机-油类食用油灌装设备-液体灌装机_青州市惠联灌装机械 | 破碎机设备-锤式颚式反击式圆锥移动冲击式破碎机厂家-成都大宏立机器公司 | 陕西锐锋建筑安装有限公司,锐锋建筑,总承包,专业分包,市政综合,劳务,水电钢构,铁路公路,房建,房屋建筑施工 | 开关柜无线测温_电缆接头测温系统_六氟化硫sf6气体泄漏报警监测_卫星同步时钟-山东正瑞电子有限公司 | 夏令营报名中心-军事夏令营哪家好-青少年夏令营推荐-中小学夏令营活动-夏令营报名中心 | 上海惠涵实业有限公司-德国进口风机,德国Elektror依莱克罗风机 上海画册设计-上海宣传册设计-产品手册设计-企业画册设计公司 | 山东宇帆航空科技有限公司官网| 全网营销_网络推广外包_全网营销代运营公司-湖南微望互动 | 全彩LED显示屏厂家_室内户外电子屏-深圳华邦瀛光电有限公司 | 襄阳亚舟重型工程机械有限公司 | 斩天手游网_高质量手机游戏下载中心| 郑州建网站,郑州做网站,郑州网站建设,郑州网站制作,郑州高端定制网站,郑州APP开发 | 离婚协议书怎么写_离婚协议书模板标准版_离婚协议书范本下载 - 离婚协议书 | 康拓威技术(深圳)有限公司|Theia镜头代理商|安讯士AXIS摄像机|安讯士监控系统|博世BOSCH监控|博世会议系统|索尼SONY监控|松下PANASONIC监控|三星韩华SAMSUNG监控|霍尼韦尔Honeywell|海康|大华|华为监控|Theia无畸变镜头|AXIS监控|安讯视摄像机 | 上海新航道学校官网_20年专注雅思_托福_SAT_ACT等出国语言培训机构. | 挥发性有机物,VOCs在线监测系统,深圳市恒富盛科技有限公司 | 生活污水处理工程安装承包-江苏富瑞源环境工程有限公司 | 指纹锁_智能锁_指纹密码锁_智能锁十大品牌_智能门锁厂家-深圳市豪力士智能科技有限公司 | 首页 - 北京明朝万达科技股份有限公司 | 金诺国际拍卖集团有限公司--金诺国际拍卖集团有限公司 | 木业信息网[www.wood186.com]全国木业建材服务平台 |