国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Foshan General Steel measuring program
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.lhp8.cn

Foshan General Steel measuring program

Time:[2016-7-6]  Hits:4245

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 天堂国产在线观看 | 午夜影视免费观看 | 男人cao女人视频在线观看 | 最近中文字幕无吗免费版 | 99精品在线观看视频 | 欧美色图久久 | 色久天| 2021免费全国凤凰楼信息 | 色综合久久中文 | 中文字幕日本在线 | 久久香蕉热 | 欧美一级看片a免费观看 | 日本人欧美xx | 香蕉在线视频网站 | 色老大综合久久综合热 | 小情侣旅馆内无套啪啪 | 色老板在线视频一区二区 | 日韩新片在线观看 | 欧洲另类一二三四区 | 天天干2018 | 亚洲天码中文字幕第一页 | 天天躁日日躁狠狠躁黑人躁 | 亚洲成人第一页 | julia中文字幕久久亚洲 | 又大又爽又粗免费视频 | 青草九九 | 青青视频网站 | 日本高清在线视频www色下载 | 午夜国产精品不卡在线观看 | 日日夜夜人人 | 亚洲欧美日韩一区成人 | 日本婷婷 | 日日操网 | 久久99久久99精品免观看不卡 | 色噜噜狠狠色综合免费视频 | 日韩剧情片 | 天天夜夜骑 | 99re8这里有精品热视频免费 | 日本宅男午夜免费永久网站 | 日本激情小视频 | 久久精品国产福利国产秒 |