Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4141

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一级特黄aaaaaa在线看首页 | 天天综合网站 | 日韩一级片免费看 | 中文字幕乱码一二三四区 | 欧日韩不卡在线视频 | 久久久久久免费精品视频 | 一本伊人 | 单亲乱对白视频在线观看 | 日韩在线一区视频 | 免费啪视频在线观看 | 麻豆画精品传媒2021直接看 | 亚洲第一国产 | 久久久久久久久66精品片 | 网址在线观看 | 俺来也俺来也天天夜夜视频 | 日韩天天操 | 亚洲制服在线观看 | 做a视频大全 | 奇米888四色在线精品 | 久久精品免视着国产成人 | 丝袜啪啪| 一个人www在线观看高清 | 成人精品视频在线观看 | 青青久精品观看视频最新 | 色噜噜综合网 | 在线视频综合视频免费观看 | 青娱乐免费在线视频 | 青娱乐在线视频免费观看 | 视频一区二区精品的福利 | 最新69堂国产成人精品视频 | 毛片网此| 午夜www在线观看完整版视频 | 日本天堂网站 | 天天躁狠狠躁 | 浪情小说| 无码中文av有码中文av | 天天插天天搞 | 青青青爽线在线视频观看 | ticklevk白小冰的视频vk | 日韩精品资源 | 91w乳液78w78w乳液 |