Steel structure workshop

Time:[2020-8-31]  Hits:3828

Transfer around the industrial park, you will find that many workshops have the impression of high, large and wide steel structure workshops. Most of the modern industrial workshops adopt the steel structure housing mode, which is better than the traditional brick and concrete building.

 

 


Steel structure workshop construction process steps

 

1.Land use permit. No matter at home or abroad, the first step of building workshop is to verify the land use right to ensure the legitimacy of housing construction.

 

2.Investigate the surrounding environment,topography and other factors, and communicate with customers to determine the preliminary design plan.

 

3.After the drawing is confirmed, the factory will arrange production. The whole production process is carried out on the industrial assembly line to ensure the unity of the steel structure and the quality of each part.

 

4.The processed steel structure will be transported to the construction site for erection, installation and final decoration. This "production build" construction mode greatly shortens the construction period, reduces the construction period and labor cost; in addition, it also reduces the construction waste on the construction site, which is in line with the social pursuit of energy conservation and environmental protection in modern life.

 

5.After the completion of construction, it will enter the final acceptance process. The relevant quality supervision department will carry out the construction acceptance of the steel structure workshop house, and finally carry out the delivery stage. From the above five links, it can be seen that the steel structure factory workshop has the advantages of "saving labor, saving money and heart, safety and environmental protection", and has become the preferred product for the construction of factories, warehouses, office buildings, gymnasiums, aircraft hangars, etc.

 

 

Quality problems are easy to occur in the process of processing and manufacturing, and it is difficult to deal with them after the occurrence of quality problems. The proportion of general process quality problems is very small.

 

Welding process

 

This process belongs to concealed engineering, and it is also one of the processes prone to quality problems. According to the statistics of product quality report of a company in 2004, the repair rate of welding seam caused by welding quality is as high as more than 80%, followed by the improper operation of the previous procedure and the technical problems of operators, accounting for about 10% It is the main problem that directly affects the quality of the project. Therefore, this type of problem must be detected and judged by professional testing company using professional testing tools. Generally, according to the type of defects in the weld, it can be divided into slag inclusion, undissolved, porosity, etc.

 

 

Painting process

 

This process is also a hidden process, the impact on the structure is less than the impact on the building function. It is also a process prone to quality problems. The quality problems of the process are mainly as follows: the paint film on the surface of the component falls off in large area and local area; the paint film on the surface of the component falls off and sags; the thickness of the paint film is not enough; the distribution of the film thickness is uneven; and the color difference of the paint film is large.

 

Assembly process

 

This process plays an important role in the quality of component processing, and its quality is greatly affected by the previous process, so it is very important to strengthen process monitoring before assembly. Generation of the process The main quality problems are as follows: the position of the assembled parts is wrong, for example, the assembly of 3450 mm is 4350 mm; the use of the parts is wrong, which should have been assembled with 2 pieces of parts, but the assembly of 3 parts; the assembly errors of parts in the correct position, such as the hole 45mm on the board originally faces outward, but the actual 45mm is installed inward; the assembly clearance of the assembled parts exceeds the specifications and technical documents Some parts are assembled without correction, and the existing deformation can not be eliminated after assembly; the operator cut privately for the convenience of the drawing, resulting in the size of the hole on the part exceeding the standard; the surface treatment of the welding area is not carried out; the assembly error is caused by the wrong size of the drawing paper.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 泽塔奥特曼普通话免费版在线观看 | 欧美综合视频在线 | 日本中文字幕网 | 天天插天天射天天干 | 免费观看四虎精品国产永久 | 特黄特色的免费大片看看 | 欧美性受xxxx黑人xyx性爽 | 久热精品免费视频 | 日韩国产精品欧美一区二区 | 青榴视频在线 | 别揉我胸啊嗯奶喷了动态图 | 日韩深夜视频 | 青青国产成人久久91 | 91久久国产露脸国语对白 | 婷婷色综合成人成人网小说 | 日本一区二区在线视频 | 在线观看免费黄视频 | 久久不卡免费视频 | 白丝被艹 | 久久免费精品视频 | 欧美特黄a级高清免费大片 欧美桃色视频 | 久在草在线 | 日韩黄色在线播放 | 色多多视频在线播放 | 午夜老司机在线观看免费 | 最近最新中文字幕免费的一页 | 青娱极品盛宴国产精品分类 | 色综合色狠狠天天久久婷婷基地 | 在线成人免费观看国产精品 | 日韩城人视频 | 在线另类| 日本人奶水中文影片 | 美女被到爽了流动态图 | 永久免费精品影视网站 | 男人猛躁进女人免费观看 | 久久精品视屏 | 亚洲精品乱码久久久久久麻豆 | 亚洲 自拍 欧美 综合 | 色噜噜狠狠一区二区 | 日韩永久免费视频 | 中文字幕久久网 |