Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:3467

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 成人免费观看完整视频 | 欧美一区综合 | 操比大片| 日本高清在线一区二区三区 | 欧美丝袜激情办公室在线观看 | 乖巧萝菊蕾小说 | 免费国产zzzwww色 | 中国一级特黄视频 | 久久久亚洲伊人色综合网站 | 青青草原伊人 | 午夜精品视频在线观看 | 色九九视频 | 青青草 久久久 | 亚洲va欧美va天堂v国产综合 | 日韩毛片在线免费观看 | 成人欧美日韩视频一区 | 日本不卡免费新一区二区三区 | 日本一区二区三区四区无限 | 午夜影院视频 | 岳刮伦小说500目录 曰批视频免费40分钟野战 | 99久久精品费精品国产一区二 | 色综合久久久高清综合久久久 | 日本一区二区在线视频 | 成人在线免费视频播放 | 日韩 欧美 亚洲国产 | 日本大片在线观看 | 日韩综合在线视频 | 萝l在线精品社区资源 | 逼逼大全| 日韩黄色在线视频 | 午夜伦理视频 | 男男gay高h樱花动漫在线观看 | 久久综合九色综合国产 | 亚洲视频一区在线观看 | 在线午夜 | 久热这里只有精品视频6 | aaaa在线观看| 色色视频网 | 一级片a级片 | 天堂网在线www资源网 | 亚洲涩色 |