国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.lhp8.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3361

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 波多野结衣之又飞调教免费观看 | 亚洲色网址 | 青青草国产在线 | 青青青青手机在线观看 | 人人干人人爽 | 久久青青草原国产精品免费 | 亚洲国产亚洲综合在线尤物 | 午夜精品久久久久久久99热下载 | 日韩精品永久免费播放平台 | 色视频在线观看免费 | 久久精品国产免费看久久精品 | 879影视动漫h免费观看 | 视频二区 素人 欧美 日韩 | 中国强jizzjapanese | 五月激情婷婷综合 | 在线观看h视频播放高清 | 亚洲六月丁香六月婷婷蜜芽 | 日本成人一区二区三区 | 天天五月天丁香婷婷深爱综合 | 91视频国产91久久久 | 插婷婷 | 青青草华人在线视频 | 久久国产精品伦理 | 中文字幕日韩在线一区国内 | 伊人日韩| 久草在线中文888 | 乱人伦中文字幕视频在线 | 原神p站黄本子免费看网站 御书屋免费自由阅读器官网 | 亚洲国产成人精品一区91 | 一本久道久久综合中文字幕 | 欧美一级做一a做片性视频 欧美一级做性受 | 亚洲综合丁香婷婷六月香 | 日韩毛片免费线上观看 | 亚洲第一网站免费视频 | 涩综合| a级日本片在线观看 | 最好韩国日本高清免费 | 被十几个男人扒开腿猛猛视频 | 日本xxxxxxxxx18 | 大伊香蕉精品一区视频在线 | 91高清在线观看 |