Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3137

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 天天干天天玩天天操 | 欧美中文一区 | 亚洲欧美视频网站 | 日日摸日日 | 男人猛躁进女人成人免 | 图片区欧美色图 | 亚洲 欧美 视频 | 日本 欧美 国产 | 久久久久久免费精品视频 | 中文国产日韩欧美视频 | 一二三四国语在线观看视频 | 色综合天天 | 日韩精品一区在线 | 亚洲日本黄色 | 日韩精品视频免费网址 | 伊人久久综合热青草 | 免费视频成人国产精品网站 | 色a| 视频一区二区三区在线观看 | 操19p| 日韩黄色小视频 | 日韩一区国产一级 | 呦系列视频一区二区三区 | 色婷婷久久综合中文久久蜜桃 | 亚洲www网站 | 久久香蕉国产线看观看式 | 日日夜夜天天人人 | 嫩草影院在线视频 | 福利视频免费观看 | 乱中年女人伦中文字幕久久 | 91色老99久久九九爱精品 | 日本视频在线免费播放 | 久久多多屋影院三级 | 久久机热这里只有精品 | 青草网 | 欧美中文字幕一区 | 成人福利在线看 | 免费观看黄a一级视频 | 天天色综 | 三级黄色高清视频 | 亚洲处破女网站 |