国产一级特黄aa大片在线-国产一级特黄aa大片免费-国产一级视频在线观看-国产一级视频久久-午夜影院免费体验-午夜影院免费入口

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.lhp8.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2769

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日操夜干 | 香蕉app在线观看免费版 | a4yy私人影院免费毛片 | 又粗又大的机巴好爽欧美 | 日韩毛片免费视频一级特黄 | 久久久久一级片 | 日本三级成人午夜视频网 | 欧美性猛交xxxx乱大交be | 久久国产香蕉一区精品 | 清纯唯美亚洲综合欧美色 | 浪潮a国内一区浪潮在线 | 一个人www在线观看高清 | 亚洲午夜精品 | 天天色天天操天天 | 中文亚洲 | 欧美性乌克兰粗大猛烈17p | 日本一二区在线观看 | 目韩一区二区三区系列片丶 | 99尹人香蕉国产免费天天拍 | 久久精品国产91久久综合麻豆自制 | 影音先锋国产系列精品 | 日本亚欧乱色视频在线系列 | 青青草原手机在线视频 | 一级免费黄色大片 | 一级做a爰片久久毛片美女图片 | 免费观看高清影视 | 一级成人a做片免费 | 亚洲黄网站wwwwww | 日夜夜操| 99热久久精里都是精品66 | 日韩免费一区二区三区在线 | ai换脸女明星被躁在线观看 | 日本漫画全彩工番口番漫画 | 公交车小说h| 揉女胸视频www网站免费观看 | 91精品欧美一区二区三区综合在线 | blue片免费观看视频 | 欧美午夜网| 液液酱yye一yye的福利免费 | 日韩精品欧美一区二区三区 | 亚洲一区在线免费 |