Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2848

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本一二三区在线视频 | 99久久免费国产精精品 | 亚洲hh | 美女内谢 | 伊人首页 | 草久影视 | 伦理片-在线观看免费播放 伦理片窝窝影院高清在线 伦理片 在线 | 亚洲精品乱码久久久久久中文字幕 | 成人免费观看视频 | 婷婷97狠狠的狠狠的爱 | ppypp欧美日韩一区二区 | 视频在线免费观看网址 | 日韩羞羞肉动漫免费视频 | 成人国产免费 | 青春草在线视频免费观看 | 欲色影视| 久久99热精品免费观看动漫 | 色婷婷久久综合中文久久一本 | 日本国产一区在线观看 | 欧美一级黄色片在线观看 | 自拍一区在线 | 强制成长在线观看 | 日本韩国在线播放 | 色妞在线影院色 | 四虎在线视频免费观看 | 五月婷激情 | 日日拍夜夜嗷嗷叫狠狠 | 一级毛片野战树林老女人 | 热久久国产最新地址获取 | 日韩欧美视频 | 天天天夜夜夜 | 日本漫画全彩口工漫画绅士 | 色播五月婷婷 | 老司机午夜精品网站在线观看 | gabrieiciark喝尿液| 欧美中文综合在线视频 | 永久免费观看午夜视频在线 | 揉她的大白胸把她摸出水了日本 | 天天激情综合 | 日本理论在线 | 医生的秘密在线观看免费韩剧中文 |