Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2360

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本www色视频成人免费网站 | 一区二区三区免费视频观看 | 成人精品一区二区久久久 | 欧美一区二区亚洲 | 欧美成人资源 | 揉女胸视频www网站免费观看 | 99精品视频看国产啪视频 | 日本在线成人 | 亚洲高清综合 | 字幕网资源站中文字幕 | 男人午夜影院 | 欧美亚洲福利 | 日本人成大片在线 | 亚洲91| 久久免费资源福利资源站 | 性刺激欧美三级在线现看中文 | 欧美视频免费看 | 天天射日 | 日韩123| 天天骑夜夜操 | h录音 国产 在线 | 暖暖日本免费大全 | 亚洲天堂资源网 | 免费久久97精品国产自在现线 | 爆操欧美美女 | 四虎永久在线精品视频免费观看 | 日韩欧美一区二区久久黑人 | gaychinese蓝男色男摄 | 囗交交性网免费 | 欧美限制级在线观看 | 日韩亚洲欧美在线com91tv | 日韩伦理视频在线观看 | 免费夜色污私人影院网站 | 御书屋海棠书屋自由阅读的小说网 | 中文字幕日韩三级 | 久久久久久久久综合影视网 | 高清 国产 日韩 欧美 | 日韩免费福利视频 | 怡红院亚洲 | 日本魔镜号 | 日韩欧美激情 |